← Street Glaston Road Opp 30

Spill evidence · River Hub

Street Glaston Road Opp 30

Combined sewer overflow · WXW00463 · feeds GLASTONBURY STW
Wet weather

The discharge

Spill day
Monday, 23 September 2024
Started
23 Sept 2024, 19:32
Ended
23 Sept 2024, 19:48
Duration
16 minutes
Receiving water
South Drain
Parish
Street

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/09/2024 (spill day)36.533 mmrain
22/09/20245.328 mmrain
21/09/20243.621 mmrain
20/09/20242.32 mmrain
19/09/20240 mmdry

River flow that day: 1.883 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
9 counted spills · 17 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00463). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.
Spill evidence — Street Glaston Road Opp 30 — River Brue and Axe Data