← Baltonsborough Main 1
Spill evidence · River Hub
Baltonsborough Main 1
Pumping station overflow · WXW00102 · feeds BUTLEIGH STW
Wet weather
The discharge
- Spill day
- Thursday, 22 January 2026
- Started
- 22 Jan 2026, 03:03
- Ended
- 22 Jan 2026, 03:19
- Duration
- 15 minutes 12 seconds
- Receiving water
- Brue - Tootle Bridge to Clyse Hole
- Parish
- Baltonsborough
Rainfall evidence
Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 22/01/2026 (spill day) | 13.718 mm | rain |
| 21/01/2026 | 7.968 mm | rain |
| 20/01/2026 | 16.328 mm | rain |
| 19/01/2026 | 2.929 mm | rain |
| 18/01/2026 | 10.912 mm | rain |
River flow that day: 26.371 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 7.7 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00102). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.