← Baltonsborough Main 1

Spill evidence · River Hub

Baltonsborough Main 1

Pumping station overflow · WXW00102 · feeds BUTLEIGH STW
Wet weather

The discharge

Spill day
Wednesday, 11 February 2026
Started
11 Feb 2026, 07:38
Ended
11 Feb 2026, 07:54
Duration
15 minutes 50 seconds
Receiving water
Brue - Tootle Bridge to Clyse Hole
Parish
Baltonsborough

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
11/02/2026 (spill day)2.959 mmrain
10/02/20267.893 mmrain
09/02/20262.925 mmrain
08/02/20268.647 mmrain
07/02/20261.346 mmrain

River flow that day: 22.053 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00102). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.
Spill evidence — Baltonsborough Main 1 — River Brue and Axe Data