← Cross East

Spill evidence · River Hub

Cross East

Pumping station overflow · WXW00346 · feeds CHEDDAR STW
Wet weather

The discharge

Spill day
Thursday, 18 December 2025
Started
18 Dec 2025, 13:32
Ended
18 Dec 2025, 21:06
Duration
7 hours 34 minutes
Receiving water
Cheddar Yeo - source to conf Stubbingham Rhyne
Parish
Compton Bishop

Rainfall evidence

Daily rainfall at the matched gauge (Clewer) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/12/2025 (spill day)17.566 mmrain
17/12/202510.711 mmrain
16/12/20250.244 mmdry
15/12/202526.827 mmrain
14/12/20258.052 mmrain

River flow that day: 40.143 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
6 counted spills · 20 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00346). Rainfall: EA Hydrology gauge 857b0206-b13b-4889-961f-729d752f6df7. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.