Spill evidence · River Hub
Chilton Polden Goose Lane O/s Collings
Combined sewer overflow · WXW00474 · feeds BURNHAM-ON-SEA / HIGHBRIDGE STW
Wet weather
The discharge
- Spill day
- Wednesday, 28 January 2026
- Started
- 28 Jan 2026, 00:32
- Ended
- 28 Jan 2026, 00:54
- Duration
- 22 minutes
- Receiving water
- South Drain
- Parish
- Chilton Polden
Rainfall evidence
Daily rainfall at the matched gauge (Gold Corner) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 28/01/2026 (spill day) | 2.794 mm | rain |
| 27/01/2026 | 0.397 mm | rain |
| 26/01/2026 | 24.101 mm | rain |
| 25/01/2026 | 0.331 mm | rain |
| 24/01/2026 | 7.767 mm | rain |
River flow that day: 29.046 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 3.0 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00474). Rainfall: EA Hydrology gauge 40e8abd2-f395-42c8-95b1-b22c3348b0b5_405278. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.