← Baltonsborough Orchard Leigh

Spill evidence · River Hub

Baltonsborough Orchard Leigh

Combined sewer overflow · WXW00828 · feeds BUTLEIGH STW
Wet weather

The discharge

Spill day
Wednesday, 21 January 2026
Started
21 Jan 2026, 19:30
Ended
21 Jan 2026, 20:52
Duration
1 hour 22 minutes
Receiving water
Brue - Tootle Bridge to Clyse Hole
Parish
Baltonsborough

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/01/2026 (spill day)7.968 mmrain
20/01/202616.328 mmrain
19/01/20262.929 mmrain
18/01/202610.912 mmrain
17/01/20260.135 mmdry

River flow that day: 34.598 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00828). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.