Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Delabole STWSSO SBB00357 | 2050 | 158 | 148 689 events | -6% | 14.8× | Falling — behind | |
| Little Petherick STW, WadebridgeSO SBB00696 | 2050 | 146 | 112 333 events | -23% | 11.2× | Falling — behind | |
| St Teath STWSO SBB01158 | 2050 | 138 | 101 97 events | -27% | 10.1× | Falling — behind | |
| Nanstallon STW, BodminSSO SBB00126 | 2050 | 65 | 47 31 events | -28% | 4.7× | Falling — behind | |
| Camelford STWSO SBB00204 | 2050 | 30 | 45 107 events | +50% | 4.5× | Rising | |
| Old Jail, BodminCSO SBB00877 | 2050 | 28 | 42 39 events | +50% | 4.2× | Rising | |
| St Breward STWSSO SBB01122 | 2050 | 41 ·25 | 41 7 events | 0% | 4.1× | — | Falling — behind |
| Dragons Pit, BodminCSO SBB00375 | 2050 | 83 | 36 27 events | -57% | 3.6× | Falling — behind | |
| Padstow Foreshore pumping stationPS-CSO/EO SBB00898 | 2050 | 18 | 26 37 events | +44% | 2.6× | Rising | |
| Blowing Hse Ln, BodminCSO SBB00121 | 2050 | 62 | 23 28 events | -63% | 2.3× | Falling — behind | |
| Chapel Amble S T SeptnkSO SBB00229 | 2050 | 5 | 20 16 events | +300% | 2× | Rising | |
| Wadebridge pumping stationPS-CSO/EO SBB01312 | 2050 | 28 | 18 19 events | -36% | 1.8× | Falling — behind | |
| Old Coach Rd, LanivetCSO SBB00871 | 2050 | 9 ·24 | 17 20 events | +89% | 1.7× | Rising | |
| Moyle Rd, PadstowCSO SBB00815 | 2050 | 9 | 16 4 events | +78% | 1.6× | Rising | |
| Delabole STWSO SBB00356 | 2050 | 231 | 11 9 events | -95% | 1.1× | Nearly there | |
| Lanivet InnCSO SBB00666 | 2050 | 14 ·24 | 11 2 events | -21% | 1.1× | Nearly there | |
| St Mabyn STWSO SBB01146 | 2050 | 4 | 7 6 events | +75% | 0.7× | Within the cap | |
| New Polzeath pumping stationPS-CSO/EO SBB00831 | 2050 | 4 | 6 6 events | +50% | 0.6× | Within the cap | |
| Porthilly Cove pumping station, Porthilly 2PS-CSO/EO SBB00963 | 2050 | 6 | 5 4 events | -17% | 0.5× | Within the cap | |
| Egloshayle Road pumping station, WadebridgePS-CSO/EO SBB00407 | 2050 | 5 | 5 0 events | 0% | 0.5× | Within the cap | |
| Market Square, CamelfordCSO SBB00748 | 2050 | 1 ·24 | 4 0 events | +300% | 0.4× | Within the cap | |
| Padstow Harbour pumping stationPS-CSO/EO SBB00899 | 2050 | 3 | 3 3 events | 0% | 0.3× | Within the cap | |
| Rock pumping station, St MinverPS-CSO/EO SBB01037 | 2050 | 1 | 3 1 events | +200% | 0.3× | Within the cap | |
| Market Place, CamelfordCSO SBB00765 | 2050 | 1 ·24 | 3 0 events | +200% | 0.3× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →