Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

4
Above the 2050 cap
of 8 tracked
2
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
4
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Coinagehall St, HelstonCSO
SBB00286
205054
61
81 events
+13%6.1×Rising
Constantine Bridge pumping station, FalmouthPS-CSO/EO
SBB00302
205013
41
44 events
+215%4.1×Rising
Constantine STWSO
SBB00303
205052
41
49 events
-21%4.1×Falling — behind
Helston STWSSO
SBB00563
205038
32
25 events
-16%3.2×Falling — behind
Penbothidno Estate, ConstantineCSO
SBB00919
20508
5
0 events
-38%0.5×Within the cap
Helston Market pumping stationPS-CSO/EO
SBB00562
205012
3
4 events
-75%0.3×Within the cap
Grange Rd S.a. Tank, HelstonCSO
SBB00513
20508
2
0 events
-75%0.2×Within the cap
The Monument, HelstonCSO
SBB00798
205014
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →