← Piermont Pl/jubilee Bridge, Dawlish

Spill evidence · River Hub

Piermont Pl/jubilee Bridge, Dawlish

Combined sewer overflow · SBB01303 · feeds DAWLISH STW
No rain data

The discharge

Spill day
Thursday, 13 February 2020
Started
13 Feb 2020, 02:31
Ended
13 Feb 2020, 02:46
Duration
15 minutes 3 seconds
Receiving water
Dawlish Water
Parish
Dawlish

Rainfall evidence

Daily rainfall at the matched gauge (Dawlish Warren) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
13/02/2020 (spill day)no data
12/02/2020no data
11/02/2020no data
10/02/2020no data
09/02/2020no data

River flow that day: 34.01 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Dawlish Town
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01303). Rainfall: EA Hydrology gauge 11a89f6e-a1ea-4386-92b7-db3e1f32d0da. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Creedy Data.