Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

45
Measures in this catchment
WINEP, current record
39
Still active
not yet past their date
6
Assumed complete
completion date has passed
15
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SW100161 · aBW_IMP1Improvement
2 spills 50m3 aggregated
BARTON HILL/BRUNSWICK PL_CSO_DAWLISH
Complete 2025-26BARTON HILL/BRUNSWICK PL_CSO_DAWLISH
08SW100161 · bBW_IMP1Improvement
2 spills 50m3 aggregated
BROOK HOUSE_CSO_DAWLISH
Complete 2025-26BROOK HOUSE_CSO_DAWLISH
08SW100161 · cBW_IMP1Improvement
2 spills 50m3 aggregated
BROOK ST MANOR GARDENS_CSO_DAWLISH
Complete 2025-26BROOK ST MANOR GARDENS_CSO_DAWLISH
08SW100161 · eBW_IMP1Improvement
2 spills 50m3 aggregated
PIERMONT PL/JUBILEE BRIDGE_CSO_DAWLISH
Complete 2025-26PIERMONT PL/JUBILEE BRIDGE_CSO_DAWLISH
08SW100161 · iBW_IMP1Improvement
2 spills 50m3 aggregated
VIADUCT SPS_PSCSOEO_DAWLISH
Complete 2025-26VIADUCT SPS_PSCSOEO_DAWLISH
08SW100161 · jBW_IMP1Improvement
2 spills 50m3 aggregated
WEST CLIFF PK/LAMBETH WK_CSO_DAWLISH
Complete 2025-26WEST CLIFF PK/LAMBETH WK_CSO_DAWLISH
08SW104909 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Cheriton Bishop STW
Due 2026-27Ford Brook (Exe)
08SW104908 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHERITON FITZPAINE STW
Due 2026-27Holly Water
08SW104907 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
CHERITON FITZPAINE STW
Due 2026-27Holly Water
08SW104878 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Crediton STW
Due 2026-27Lower Creedy
08SW104877 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Crediton STW
Due 2026-27Lower Creedy
08SW104493 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Kenn & Kennford STW: Kenn and Kennford Pumping Station
Due 2026-27Kenn
08SW104492 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Kenn & Kennford STW: Kenn and Kennford Pumping Station
Due 2026-27Kenn
08SW104705 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
NEWTON ST CYRES STW
Due 2026-27Lower Creedy
08SW104704 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
NEWTON ST CYRES STW
Due 2026-27Lower Creedy
08SW104643 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
SANDFORD STW
Due 2026-27Middle Creedy
08SW104644 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
SANDFORD STW
Due 2026-27Middle Creedy
08SW104577 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Tedburn St Mary STW
Due 2026-27Culvery River
08SW104578 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Tedburn St Mary STW
Due 2026-27Culvery River
08SW104525 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
YEOFORD STW
Due 2026-27Upper Yeo (Creedy)
08SW104526 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
YEOFORD STW
Due 2026-27Upper Yeo (Creedy)
08SW104999 · ajEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
CLIFTON RD/ALBERT RD_CSO_EXETER
Due 2027-28CLIFTON RD/ALBERT RD_CSO_EXETER
08SW104999 · akEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
CLIFTON RD/CHUTE ST_CSO_EXETER
Due 2027-28CLIFTON RD/CHUTE ST_CSO_EXETER
08SW104999 · amEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
COLLETON GROVE_CSO_EXETER
Due 2027-28COLLETON GROVE_CSO_EXETER
08SW104999 · auEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
DIXS FIELD_CSO_EXETER
Due 2027-28DIXS FIELD_CSO_EXETER
08SW104999 · bbEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
EXETER BOWLING CLUB_CSO_EXETER
Due 2027-28EXETER BOWLING CLUB_CSO_EXETER
08SW104999 · buEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
HOLLOWAY ST_CSO_EXETER
Due 2027-28HOLLOWAY ST_CSO_EXETER
08SW104999 · byEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
LARKBEARE HSE_CSO_EXETER
Due 2027-28LARKBEARE HSE_CSO_EXETER
08SW104999 · caEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
LORDS MEADOW STW_SO_CREDITON
Due 2027-28LORDS MEADOW STW_SO_CREDITON
08SW104999 · cbEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
LORDS MEADOW STW_SSO_CREDITON
Due 2027-28LORDS MEADOW STW_SSO_CREDITON
08SW104999 · cfEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
MAGDALEN RD_CSO_EXETER
Due 2027-28MAGDALEN RD_CSO_EXETER
08SW104999 · csEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
NEWTON ST CYRES STW_SO_NEWTON ST CYRES
Due 2027-28NEWTON ST CYRES STW_SO_NEWTON ST CYRES
08SW104999 · dbEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
PARIS STREET_CSO_EXETER
Due 2027-28PARIS STREET_CSO_EXETER
08SW100187 · aWFD_INVInvestigation
*Holding Line* investigation to inform potential requirements for AMP9
POUGHILL STW
Due 2027-28Holly Water
08SW104999 · epEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
TEMPLE RD_CSO_EXETER
Due 2027-28TEMPLE RD_CSO_EXETER
08SW101449 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
CLIFTON RD/ALBERT RD_CSO_EXETER
Due 2029-30CLIFTON RD/ALBERT RD_CSO_EXETER
08SW101450 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
CLIFTON RD/CHUTE ST_CSO_EXETER
Due 2029-30CLIFTON RD/CHUTE ST_CSO_EXETER
08SW101453 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
COLLETON GROVE_CSO_EXETER
Due 2029-30COLLETON GROVE_CSO_EXETER
08SW102874 · aINNS_NDNo deterioration
Action related to crayfish survival. Multi-AMP scheme - to continue through AMP8/9
Creedy catchment crayfish
Due 2029-30Lower Yeo (Creedy)
08SW101468 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
DIXS FIELD_CSO_EXETER
Due 2029-30DIXS FIELD_CSO_EXETER
08SW101477 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
EXETER BOWLING CLUB_CSO_EXETER
Due 2029-30EXETER BOWLING CLUB_CSO_EXETER
08SW101539 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
MAGDALEN RD_CSO_EXETER
Due 2029-30MAGDALEN RD_CSO_EXETER
08SW101578 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
PARIS STREET_CSO_EXETER
Due 2029-30PARIS STREET_CSO_EXETER
08SW101632 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
TEMPLE RD_CSO_EXETER
Due 2029-30TEMPLE RD_CSO_EXETER
08SW102113 · vU_IMP1Improvement
Improve discharge from agglomeration that has crossed 250 and has envirronmental imapct
SHILLINGFORD ST GEORGE_STW_SHILLINGFORD
Due 2030-31Matford Brook

45 of 45 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.