EA sampling point

Church Farm, Alvediston

Sampled by the Environment Agency on 3 visits in 2026.

Phosphate

2026: avg 0.042 · max 0.043 mg/l
00.050.10.150.22026-03-18: 0.042 mg/l2026-06-30: 0.041 mg/l2026-09-07: 0.043 mg/l
High ≤ 0.036Good ≤ 0.069Moderate ≤ 0.173Poor ≤ 1.003Bad > 1.003

Ammonia

2026: avg 0.015 · max 0.015 mg/l
00.20.40.62026-03-18: below 0.03 mg/l2026-06-30: below 0.03 mg/l2026-09-07: below 0.03 mg/l
High ≤ 0.2Good ≤ 0.3Moderate ≤ 0.75Poor ≤ 1.1Bad > 1.1

Dissolved oxygen

2026: avg 71 · min 66 % saturation
60801001202026-03-18: 73.2 % saturation2026-06-30: 72.5 % saturation2026-09-07: 66.3 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

9.9–19.1 °C

Warm water holds less oxygen. There is no river standard for temperature here.

01020302026-03-18: 9.9 °C2026-06-30: 19.1 °C2026-09-07: 18 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative: the Environment Agency’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Conductivity at 25 C (MICROSIEMENS PER CENTIMETRE)

EA sampling point SW-5025GW11 · Ebble (Upper) · 471 readings of 116 tests since 2022.

DateResultUnitSample
2026-09-07 10:12654MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2026-06-30 10:37641MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2026-03-18 12:51635MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2025-12-11 12:23441MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2025-03-05 12:01624MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2024-12-12 11:33636MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2024-09-02 12:00648MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2024-06-19 14:53636MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2024-03-01 13:21642MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2023-12-13 10:30638MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2023-09-13 11:47658MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2022-12-22 12:19664MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)
2022-09-28 13:54668MICROSIEMENS PER CENTIMETREGROUNDWATER - PURGED/PUMPED/REFILLED · ENVIRONMENTAL MONITORING STATUTORY (EU DIRECTIVES)

Source: Environment Agency Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the River Dorset Stour.