Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

18
Measures in this catchment
WINEP, current record
18
Still active
not yet past their date
0
Assumed complete
completion date has passed
4
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SO102512 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Bishops Waltham WTW
Due 2026-27BISHOPS WALTHAM SSO - 115716
08SO102692 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
BISHOPS WALTHAM WWTW
Due 2026-27BISHOPS WALTHAM SSO - 115716
08SO102429 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
East Meon WTW
Due 2026-27EAST MEON
08SO102735 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
EAST MEON WWTW
Due 2026-27Meon
08SO102523 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Southwick WTW
Due 2026-27SOUTHWICK
08SO102884 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
SOUTHWICK WWTW
Due 2026-27Wallington below Southwick
08SO102507 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Wickham WTW
Due 2026-27Meon
08SO102929 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
WICKHAM WWTW
Due 2026-27Meon
08SO104950 · oqEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
HEATHEN LANE DURLEY CEO
Due 2027-28Horton Heath Stream
08SO104950 · odEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the Shellfish Water and ensure no more than 10 spills per annum (on average) as an agglomeration
HIGH STREET FAREHAM CSO
Due 2027-28Wallington below Southwick
08SO102616 · aWFD_INV_N-TalInvestigation
Investigation to assess treatment options for nitrogen. Full-scale trial, 4-stage Bardenpho, methanol dosing
Peel Common WTW
Due 2027-28Alver
08SO104950 · rqEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
WICKHAM SSO
Due 2027-28Meon
08SO103250 · aSW_NDNo deterioration
SuDS + Storage
HIGH STREET FAREHAM CSO
Due 2027-28Wallington below Southwick
08SO104410 · aSW_NDNo deterioration
Provide improvements to reduce continuous discharge microibiological load
Southwick WTW
Due 2027-28SOUTHWICK
08SO103968 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 15 mg/l
BISHOPS WALTHAM
Due 2029-30BISHOPS WALTHAM SSO - 115716
08SO103999 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 24.5 mg/l
WICKHAM WWTW
Due 2029-30Meon
08SO103950 · aEnvAct_IMP2Improvement
Preferred option SuDS and Storage, but costs based on storage only
HEATHEN LANE DURLEY CEO
Due 2034-35Horton Heath Stream
08SO103931 · aEnvAct_IMP2Improvement
Wetland + Lining
WICKHAM SSO
Due 2034-35Meon

18 of 18 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.