← Ewhurst Lane Northiam Ceo - 108221
Spill evidence · River Hub
Ewhurst Lane Northiam Ceo - 108221
Pumping station overflow · SWS00292 · feeds QUICKBOURNE LANE NORTHIAM
Wet weather
The discharge
- Spill day
- Monday, 6 May 2024
- Started
- 6 May 2024, 11:45
- Ended
- 6 May 2024, 21:30
- Duration
- 9 hours 45 minutes
- Receiving water
- Lower Rother from Etchingham to Scot's Float
- Parish
- Northiam
Rainfall evidence
Daily rainfall at the matched gauge (Sandhurst) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 06/05/2024 (spill day) | 11.8 mm | rain |
| 05/05/2024 | 6.6 mm | rain |
| 04/05/2024 | 0 mm | dry |
| 03/05/2024 | 0.2 mm | dry |
| 02/05/2024 | 0.2 mm | dry |
River flow that day: 5.192 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.6 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- No — the works was also overflowing that day.
- EA annual return (2024)
- 38 counted spills · 266 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00292). Rainfall: EA Hydrology gauge 112af4fb-859e-49b4-bbc7-c43d8552accc. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Eastern Rother Data.