← Town Hill, Ermington
Spill evidence · River Hub
Town Hill, Ermington
Combined sewer overflow · SBB00911 · feeds ERMINGTON_STW_PLYMOUTH
Wet weather
The discharge
- Spill day
- Friday, 23 January 2026
- Started
- 23 Jan 2026, 18:08
- Ended
- 23 Jan 2026, 19:15
- Duration
- 1 hour 7 minutes
- Receiving water
- Lower Erme
- Parish
- Ermington
Rainfall evidence
Daily rainfall at the matched gauge (Plympton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 23/01/2026 (spill day) | 20 mm | rain |
| 22/01/2026 | 12.9 mm | rain |
| 21/01/2026 | 5.7 mm | rain |
| 20/01/2026 | 45.3 mm | rain |
| 19/01/2026 | 2.6 mm | rain |
River flow that day: 39.015 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 5.6 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Mothecombe; Coastguards Beach, Erme Estuary
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00911). Rainfall: EA Hydrology gauge b779beab-751f-439d-bd30-0f79b866a399. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Erme Data.