Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

6
Above the 2050 cap
of 10 tracked
3
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
4
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Newlyn East STWSO
SBB01156
205030
74
83 events
+147%7.4×Rising
Fraddon STWSO
SBB00477
2050146
67
21 events
-54%6.7×Falling — behind
St Columb RdCSO
SBB00998
205054 ·24
61
32 events
+13%6.1×Rising
Mitchell pumping station, TruroPS-CSO/EO
SBB00792
205069 ·24
48
55 events
-30%4.8×Falling — behind
Junction A39 FraddonCSO
SBB00476
20507 ·24
23
15 events
+229%2.3×Rising
St Columb STWSSO
SBB01126
205031
16
24 events
-48%1.6×Falling — behind
Village pumping station, St MawganPS-CSO/EO
SBB01151
20509
10
10 events
+11%1×Within the cap
Fernpit pumping station, NewquayPS-CSO/EO
SBB00445
205052
7
9 events
-87%0.7×Within the cap
St. Columb Major, St ColumbCSO
SBB00289
20501
1
0 events
0%0.1×Within the cap
Rosewastis pumping station, St ColumbPS-CSO/EO
SBB01406
20500 ·23
0
0 events
—0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →