What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08WW100215 · b | HD_IMP | Improvement | Full options appraisal to determine the best value solution to the impact of Shrewton WRC on the local ecology. Options appraisal for Shrewton WRC - Discharge Relocation | Complete 2025-26 | Till (Hampshire Avon) |
| 08WW100628 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) All Cannings WRC - All Cannings SPS Flow Monitoring | Due 2026-27 | Etchilhampton Water |
| 08WW100401 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) All Cannings WRC - All Cannings SPS Overflow Monitoring | Due 2026-27 | Etchilhampton Water |
| 08WW100629 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) All Cannings WRC - Horton SPS Flow Monitoring | Due 2026-27 | Etchilhampton Water |
| 08WW100632 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Amesbury WRC Flow Monitoring | Due 2026-27 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW100405 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Amesbury WRC Overflow Monitoring | Due 2026-27 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW100634 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Barford St Martin WRC Flow Monitoring | Due 2026-27 | Nadder (Middle) |
| 08WW100407 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Barford St Martin WRC Overflow Monitoring | Due 2026-27 | Nadder (Middle) |
| 08WW100099 · a | WFD_NDINV_WRFlow | Investigation | Investigate effect of abstraction from Wessex Water's source at Bulbridge on the WFD status of River Nadder Bulbridge WFD ND investigation | Due 2026-27 | Nadder (Middle) |
| 08WW100671 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Collingbourne Ducis WRC - Collingbourne Ducis SPS Flow Monitoring | Due 2026-27 | Bourne (Hampshire Avon) |
| 08WW100445 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Collingbourne Ducis WRC - Collingbourne Ducis SPS Overflow Monitoring | Due 2026-27 | Bourne (Hampshire Avon) |
| 08WW100100 · a | WFD_NDINV_WRFlow | Investigation | Investigate effect of abstraction from Wessex Water's source at Devizes Road on the WFD status of the Hampshire Avon (upper) d/s Nine Mile River confluence Devizes Road WFD ND investigation | Due 2026-27 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW100093 · a | WFD_NDINV_WRFlow | Investigation | Investigate effect of abstraction from Wessex Water's source at Fonthill Bishop on the WFD status of the Fonthill Stream and Teffont Brook Fonthill Bishop WFD ND investigation | Due 2026-27 | Fonthill Stream |
| 08WW100704 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Fovant WRC Flow Monitoring | Due 2026-27 | Fovant Brook |
| 08WW100478 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Fovant WRC Overflow Monitoring | Due 2026-27 | Fovant Brook |
| 08WW100712 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Great Wishford WRC Flow Monitoring | Due 2026-27 | Wylye (Lower) |
| 08WW100486 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Great Wishford WRC Overflow Monitoring | Due 2026-27 | Wylye (Lower) |
| 08WW100727 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Hurdcott WRC Flow Monitoring | Due 2026-27 | Bourne (Hampshire Avon) |
| 08WW100499 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Hurdcott WRC Overflow Monitoring | Due 2026-27 | Bourne (Hampshire Avon) |
| 08WW100102 · a | WFD_NDINV_WRFlow | Investigation | Investigate effect of abstraction from Wessex Water's source at Leckford Bridge on the WFD status of the Bourne (Hampshire Avon) Leckford Bridge WFD ND investigation | Due 2026-27 | Bourne (Hampshire Avon) |
| 08WW100743 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Maiden Bradley WRC Flow Monitoring | Due 2026-27 | Wylye (Headwaters) |
| 08WW100515 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Maiden Bradley WRC Overflow Monitoring | Due 2026-27 | Wylye (Headwaters) |
| 08WW100888 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) MONKTON DEVERILL WRC flow monitoring | Due 2026-27 | Wylye (Headwaters) |
| 08WW100866 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) MONKTON DEVERILL WRC overflow monitoring | Due 2026-27 | Wylye (Headwaters) |
| 08WW100768 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Pewsey WRC Flow Monitoring | Due 2026-27 | Hampshire Avon (East) and Woodborough Stream |
| 08WW100540 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Pewsey WRC Overflow Monitoring | Due 2026-27 | Hampshire Avon (East) and Woodborough Stream |
| 08WW100778 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Ratfyn WRC Flow Monitoring | Due 2026-27 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW100551 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Ratfyn WRC Overflow Monitoring | Due 2026-27 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW100793 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Shrewton WRC Flow Monitoring | Due 2026-27 | Till (Hampshire Avon) |
| 08WW100566 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Shrewton WRC Overflow Monitoring | Due 2026-27 | Till (Hampshire Avon) |
| 08WW100823 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Warminster WRC Flow Monitoring | Due 2026-27 | Wylye (Headwaters) |
| 08WW100597 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Warminster WRC Overflow Monitoring | Due 2026-27 | Wylye (Headwaters) |
| 08WW100402 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WRC - Farm SPS Overflow Monitoring | Due 2026-27 | Etchilhampton Water |
| 08WW101000 · hf | EnvAct_INV4 | Investigation | Storm overflows - Investigations ***A-WINEP*** CAMP ROAD SPS SO Investigation (14311B) | Due 2027-28 | Till (Hampshire Avon) |
| 08WW101000 · hg | EnvAct_INV4 | Investigation | Storm overflows - Investigations ***A-WINEP*** FARM PUMPING STATION SO Investigation (14058B) | Due 2027-28 | Etchilhampton Water |
| 08WW101000 · he | EnvAct_INV4 | Investigation | Storm overflows - Investigations ***A-WINEP*** HINDON WASTEWATER TREATMENT WORKS SO Investigation (13149C) | Due 2027-28 | Fonthill Stream |
| 08WW100053 · a | WFD_INV_CHEM | Investigation | Ecotoxicological study of Ratfyn WRC discharge (Hampshire Avon) 4g Local investigation Ratfyn WRC - Discharge Investigation | Due 2027-28 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW101000 · fm | EnvAct_INV4 | Investigation | Storm overflows - Investigations BARFORD ST MARTIN WRC SO Investigation (13015S) | Due 2027-28 | Nadder (Middle) |
| 08WW101000 · cw | EnvAct_INV4 | Investigation | Storm overflows - Investigations CALVESWATER PUMPING STATION SO Investigation (14439B) | Due 2027-28 | Wylye Trib (The Were or Swan) |
| 08WW101000 · hx | EnvAct_INV4 | Investigation | Storm overflows - Investigations COLLINGBOURNE DUCIS PUMPING STATION SO Investigation (14050B) | Due 2027-28 | Bourne (Hampshire Avon) |
| 08WW101000 · co | EnvAct_INV4 | Investigation | Storm overflows - Investigations FOVANT WATER RECYCLING CENTRE SO Investigation (13129S) | Due 2027-28 | Fovant Brook |
| 08WW101000 · cx | EnvAct_INV4 | Investigation | Storm overflows - Investigations GREAT WISHFORD WRC SO Investigation (13353S) | Due 2027-28 | Wylye (Lower) |
| 08WW101000 · iq | EnvAct_INV4 | Investigation | Storm overflows - Investigations HINDON PUMPING STATION SO Investigation (14346B) | Due 2027-28 | Fonthill Stream |
| 08WW101000 · cu | EnvAct_INV4 | Investigation | Storm overflows - Investigations HURDCOTT WASTEWATER TREATMENT WORKS SO Investigation (13158S) | Due 2027-28 | Bourne (Hampshire Avon) |
| 08WW101000 · nd | EnvAct_INV4 | Investigation | Storm overflows - Investigations LAKE PLEASURE GARDENS CSO | Due 2027-28 | Wylye Trib (The Were or Swan) |
| 08WW101000 · cd | EnvAct_INV4 | Investigation | Storm overflows - Investigations MAIDEN BRADLEY WWTW SO Investigation (13191C) | Due 2027-28 | Wylye (Headwaters) |
| 08WW101000 · cv | EnvAct_INV4 | Investigation | Storm overflows - Investigations SHREWTON WATER RECYCLING CENTRE SO Investigation (13275S) | Due 2027-28 | Till (Hampshire Avon) |
| 08WW101000 · hq | EnvAct_INV4 | Investigation | Storm overflows - Investigations SPANIEL'S BRIDGE PUMPING STATION SO Investigation (14047B) | Due 2027-28 | Etchilhampton Water |
| 08WW102062 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Amesbury WRC - Phosphorus Removal | Due 2029-30 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW101002 · dy | EnvAct_IMP2 | Improvement | EnvAct_IMP4dy. Storm overflows - Frequency improvements BARFORD ST MARTIN WRC SO improvement (13015S) | Due 2029-30 | Nadder (Middle) |
| 08WW102063 · a | HD_IMP | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Bishops Cannings (All Cannings) WRC - Phosphorus Removal | Due 2029-30 | Etchilhampton Water |
| 08WW101002 · bi | EnvAct_IMP4 | Improvement | EnvAct_IMP4bi. Storm overflows - Frequency improvements CALVESWATER PUMPING STATION SO improvement (14439B) | Due 2029-30 | Wylye Trib (The Were or Swan) |
| 08WW101002 · we | EnvAct_IMP4 | Improvement | Storm overflows - Wetland treatment solution. COATE, SPANIELS BRIDGE (Site ID 14047B) | Due 2029-30 | Etchilhampton Water |
| 08WW100230 · a | DrWPA_IMP | Improvement | Improvements to WRC to achieve new nitrogen permit. Collingbourne Ducis WRC - Nitrogen Removal | Due 2029-30 | Bourne (Hampshire Avon) |
| 08WW103022 · a | WFD_IMPm | Improvement | Improvements to WRC (or alternative catchment option) to achieve tightened phosphorus permit. East Knoyle WRC - Phosphorus Removal | Due 2029-30 | Sem |
| 08WW101002 · wc | EnvAct_IMP4 | Improvement | Storm overflows - Wetland treatment solution. FARM (Site ID 14058B) | Due 2029-30 | Etchilhampton Water |
| 08WW101002 · ba | EnvAct_IMP4 | Improvement | EnvAct_IMP4ba. Storm overflows - Frequency improvements FOVANT WATER RECYCLING CENTRE SO improvement (13129S) | Due 2029-30 | Fovant Brook |
| 08WW102067 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Great Wishford WRC - Phosphorus Removal | Due 2029-30 | Wylye (Lower) |
| 08WW101002 · bj | EnvAct_IMP2 | Improvement | EnvAct_IMP4bj. Storm overflows - Frequency improvements GREAT WISHFORD WRC SO improvement (13353S) | Due 2029-30 | Wylye (Lower) |
| 08WW101002 · bg | EnvAct_IMP2 | Improvement | EnvAct_IMP4bg. Storm overflows - Frequency improvements HURDCOTT WASTEWATER TREATMENT WORKS SO improvement (13158S) | Due 2029-30 | Bourne (Hampshire Avon) |
| 08WW102068 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Hurdcott WRC - Phosphorus Removal | Due 2029-30 | Bourne (Hampshire Avon) |
| 08WW100231 · a | WFDGW_IMP | Improvement | Improvements to WRC to achieve new nitrogen permit. Maiden Bradley WRC - Nitrogen Removal | Due 2029-30 | Wylye (Headwaters) |
| 08WW103023 · a | HD_IMP | Improvement | Improvements to WRC (or alternative catchment option) to achieve tightened phosphorus permit. Marden WRC - Phosphorus Removal | Due 2029-30 | Hampshire Avon (West) |
| 08WW102069 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Netheravon WRC - Phosphorus Removal | Due 2029-30 | Hampshire Avon (Upper) u/s Nine Mile River confl |
| 08WW102070 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Pewsey WRC - Phosphorus Removal | Due 2029-30 | Hampshire Avon (East) and Woodborough Stream |
| 08WW100214 · a | HD_IMP | Improvement | Discharge relocation from WRC, to upstream in river, to improve river flow upstream of abstraction. Ratfyn WRC - Discharge Relocation | Due 2029-30 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW102071 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Ratfyn WRC - Phosphorus Removal | Due 2029-30 | Hampshire Avon (Upper) d/s Nine Mile River confl |
| 08WW103065 · a | U_IMP1 | Improvement | Change from descriptive to numerical permit, with associated improvements to WRC (notably sanitary limits and flow measurement). Site <250pe but numerical permit required as WRC gaining phosphorus permit limit. Semley WRC - Numerical Permit | Due 2029-30 | Sem |
| 08WW103062 · a | WFD_IMPm | Improvement | Improvements to WRC to achieve new phosphorus permit. Semley WRC - Phosphorus removal | Due 2029-30 | Sem |
| 08WW101002 · bh | EnvAct_IMP2 | Improvement | EnvAct_IMP4bh. Storm overflows - Frequency improvements SHREWTON WATER RECYCLING CENTRE SO improvement (13275S) | Due 2029-30 | Till (Hampshire Avon) |
| 08WW100215 · a | HD_IMP | Improvement | Discharge relocation from WRC to improve river water quality in winterbourne stretch. Shrewton WRC - Discharge Relocation | Due 2029-30 | Till (Hampshire Avon) |
| 08WW102074 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Shrewton WRC - Phosphorus Removal | Due 2029-30 | Till (Hampshire Avon) |
| 08WW103067 · a | U_IMP1 | Improvement | Change from descriptive to numerical permit, with associated improvements to WRC (notably sanitary limits and flow measurement). Site <250pe but numerical permit required as WRC gaining phosphorus permit limit. Stanton St Bernard WRC - Numerical Permit | Due 2029-30 | Etchilhampton Water |
| 08WW103024 · a | HD_IMP | Improvement | Improvements to WRC (or alternative catchment option) to achieve new phosphorus permit. Stanton St Bernard WRC - Phosphorus Removal | Due 2029-30 | Etchilhampton Water |
| 08WW101002 · wh | EnvAct_IMP4 | Improvement | Storm overflows - Wetland treatment solution. TILSHEAD, CAMP ROAD (Site ID 14311B) | Due 2029-30 | Till (Hampshire Avon) |
| 08WW102075 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Tisbury WRC - Phosphorus Removal | Due 2029-30 | Nadder (Middle) |
| 08WW103063 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Upavon WRC - Phosphorus removal | Due 2029-30 | Hampshire Avon (Upper) u/s Nine Mile River confl |
| 08WW102076 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Warminster WRC - Phosphorus Removal | Due 2029-30 | Wylye (Headwaters) |
| 08WW103066 · a | U_IMP1 | Improvement | Change from descriptive to numerical permit, with associated improvements to WRC (notably sanitary limits and flow measurement). Site <250pe but numerical permit required as WRC gaining phosphorus permit limit. Wedhampton WRC - Numerical Permit | Due 2029-30 | Etchilhampton Water |
| 08WW103064 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Wedhampton WRC - Phosphorus removal | Due 2029-30 | Etchilhampton Water |
80 of 80 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.