EA sampling point

Benny Stream at Trewerry Mill

Sampled by the Environment Agency on 6 visits in 2025. Dissolved oxygen is high. Averages are over 2023–2025.

Dissolved oxygen

2025: avg 99 · min 96 % saturation

Band, 2023–2025 average: 99 · High

60801001202025-01-15: 97.3 % saturation2025-02-12: 98.8 % saturation2025-03-31: 102.2 % saturation2025-05-01: 100.9 % saturation2025-05-30: 100.3 % saturation2025-06-30: 96.3 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

7.4–15.2 °C

Warm water holds less oxygen. There is no river standard for temperature here.

051015202025-01-15: 8.4 °C2025-02-12: 7.4 °C2025-03-31: 8.4 °C2025-05-01: 12.3 °C2025-05-30: 14.9 °C2025-06-30: 15.2 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative: the Environment Agency’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Conductivity at 25 C (MICROSIEMENS PER CENTIMETRE)

EA sampling point SW-82410610 · Benny Stream · 389 readings of 36 tests since 2021.

DateResultUnitSample
2025-06-30 11:05307MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-05-30 10:50307MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-05-01 10:05300MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-03-31 09:48312MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-12 10:05317MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-01-15 09:34309MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-12-17 09:33312MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-13 09:30313MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-03-09 16:00415MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS)
2022-03-29 14:50308MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)
2022-03-23 13:47311MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)
2022-02-10 15:53307MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)
2022-01-31 15:22311MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)
2022-01-25 16:38308MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)
2021-11-30 15:40314MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)
2021-10-29 14:04224MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)
2021-08-11 15:31313MICROSIEMENS PER CENTIMETRERIVER / RUNNING SURFACE WATER · MONITORING (NATIONAL AGENCY POLICY)

Source: Environment Agency Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Hayle & Red River.