Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Praze An Beeble STWSSO SBB00980 | 2050 | 177 ·24 | 147 50 events | -17% | 14.7× | Falling — behind | |
| Goonhavern STWSSO SBB00500 | 2050 | 115 | 115 57 events | 0% | 11.5× | Falling — behind | |
| Goonhavern STWSO SBB00499 | 2050 | 73 | 84 75 events | +15% | 8.4× | Rising | |
| Relistian pumping stationPS-CSO/EO SBB01021 | 2050 | 41 | 76 102 events | +85% | 7.6× | Rising | |
| Troon 1&2CSO SBB01286 | 2050 | 84 ·24 | 71 79 events | -15% | 7.1× | Falling — behind | |
| Tolvaddon Tank, RedruthCSO SBB01249 | 2050 | 33 | 69 73 events | +109% | 6.9× | Rising | |
| Penponds pumping station, CambornePS-CSO/EO SBB00779 | 2050 | 52 ·24 | 62 64 events | +19% | 6.2× | Rising | |
| Reskadinnick pumping station, CambornePS-CSO/EO SBB01023 | 2050 | 38 | 42 51 events | +11% | 4.2× | Rising | |
| Knave-go-by, CamborneCSO SBB00649 | 2050 | 8 | 40 50 events | +400% | 4× | Rising | |
| St Martins Crescent, CamborneCSO SBB01147 | 2050 | 15 | 19 10 events | +27% | 1.9× | Rising | |
| Sunnyside Tank, RedruthCSO SBB01195 | 2050 | 8 | 12 3 events | +50% | 1.2× | Rising | |
| Copper Terrace, HayleCSO SBB01400 | 2050 | 4 ·25 | 4 6 events | 0% | 0.4× | — | Within the cap |
| Chapel Hill, CamborneCSO SBB01421 | 2050 | 1 ·24 | 2 0 events | +100% | 0.2× | Within the cap | |
| Station Road pumping station, PerranporthPS-CSO/EO SBB01165 | 2050 | 6 | 1 1 events | -83% | 0.1× | Within the cap | |
| Praze An Beeble STWSO SBB00979 | 2050 | 4 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →