Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Dodnor Ceo - 108516 SWS00256 | 2050 | 97 ·24 | 76 72 events | -22% | 7.6× | Falling — behind | |
| Sandown New No.1, - 115453SSO SWS00741 | 2050 | 155 ·24 | 71 249 events | -54% | 7.1× | Falling — behind | |
| Sandown New No.2, - 115454SSO SWS00742 | 2050 | 128 ·24 | 69 256 events | -46% | 6.9× | Falling — behind | |
| Fairlee Road Newport Outside 62, - 108507CSO SWS00294 | 2050 | 79 ·24 | 58 79 events | -27% | 5.8× | Falling — behind | |
| Fairlee, - 111781CSO SWS00293 | 2050 | 79 ·24 | 52 70 events | -34% | 5.2× | Falling — behind | |
| Medina Road Cowes Ceo - 108537 SWS00869 | 2050 | 13 ·24 | 48 12 events | +269% | 4.8× | Rising | |
| Rosanna Sailing School Wootton, - 100599CSO SWS00721 | 2050 | 75 ·24 | 41 81 events | -45% | 4.1× | Falling — behind | |
| Albany Road East Cowes Ceo - 116071 SWS00146 | 2050 | 8 ·24 | 40 11 events | +400% | 4× | Rising | |
| Main Road Porchfield Ceo - 108550 SWS00670 | 2050 | 37 ·24 | 37 29 events | 0% | 3.7× | Falling — behind | |
| Bow Bridge Freshwater Ceo - 108512 SWS00086 | 2050 | 63 ·24 | 34 38 events | -46% | 3.4× | Falling — behind | |
| School Green Road Freshwater Ceo - 108522 SWS00748 | 2050 | 37 ·24 | 31 39 events | -16% | 3.1× | Falling — behind | |
| Coastguard Lane Freshwater Bay Ceo - 108521 SWS00334 | 2050 | 17 ·24 | 15 18 events | -12% | 1.5× | Nearly there | |
| Kings Manor Ceo - 108530 SWS00475 | 2050 | 18 ·24 | 9 9 events | -50% | 0.9× | Within the cap | |
| The Point Bembridge New Ceo - 110194 SWS00055 | 2050 | 15 ·24 | 9 10 events | -40% | 0.9× | Within the cap | |
| Hope Beach Shanklin New Ceo - 109389 SWS00445 | 2050 | 21 ·24 | 9 3 events | -57% | 0.9× | Within the cap | |
| Mill Road Yarmouth, - 108538CSO SWS00573 | 2050 | 1 ·24 | 5 4 events | +400% | 0.5× | Within the cap | |
| Luccombe Ceo - 110208 SWS00525 | 2050 | 13 ·24 | 5 5 events | -62% | 0.5× | Within the cap | |
| Floating Bridge Cowes, - 109300CSO SWS00319 | 2050 | 10 ·24 | 3 0 events | -70% | 0.3× | Within the cap | |
| Eastern Gardens Sandown Ceo - 108039 SWS00277 | 2050 | 5 ·24 | 2 2 events | -60% | 0.2× | Within the cap | |
| Lion Point Ventnor Ceo - 108546 SWS00509 | 2050 | 12 ·24 | 1 1 events | -92% | 0.1× | Within the cap | |
| The Duver St Helens Ceo - 108561 SWS00809 | 2050 | 2 ·21 | 0 0 events | -100% | 0× | Within the cap | |
| Norton Green Ceo - 108543 SWS00620 | 2050 | 1 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Shanklin Chine, - 108046CSO SWS00313 | 2050 | 2 ·22 | 0 0 events | -100% | 0× | — | Within the cap |
| Sws90086 SWS90086 | 2050 | 1 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →