← Mill Lane Kennington Ceo - 108684

Spill evidence · River Hub

Mill Lane Kennington Ceo - 108684

Pumping station overflow · SWS00571 · feeds ASHFORD STW
Wet weather

The discharge

Spill day
Sunday, 10 March 2024
Started
10 Mar 2024, 16:30
Ended
12 Mar 2024, 00:28
Duration
1 day 7 hours
Receiving water
Great Stour between Ashford and Wye
Parish
Kennington

Rainfall evidence

Daily rainfall at the matched gauge (Bybrook) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
10/03/2024 (spill day)6.86 mmrain
09/03/20243.44 mmrain
08/03/20240.02 mmdry
07/03/20240.01 mmdry
06/03/20240.01 mmdry

River flow that day: 18.989 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
53 counted spills · 748 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00571). Rainfall: EA Hydrology gauge fa56d591-cb61-430a-93d8-2fe37150a99b. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Kent Stour Data.