Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

51
Measures in this catchment
WINEP, current record
51
Still active
not yet past their date
0
Assumed complete
completion date has passed
16
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SO102440 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Ashford WTW
Due 2026-27Great Stour between Ashford and Wye
08SO102676 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
ASHFORD WWTW
Due 2026-27Great Stour between Ashford and Wye
08SO102445 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Canterbury WTW
Due 2026-27Great Stour between A2 and West Stourmouth
08SO102709 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
CANTERBURY WWTW
Due 2026-27Great Stour between A2 and West Stourmouth
08SO102556 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
CHARING
Due 2026-27Upper Great Stour
08SO102713 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
CHARING WWTW
Due 2026-27Upper Great Stour
08SO102603 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Churchfield Way Wye WPS
Due 2026-27Great Stour between Wye and A2
08SO102719 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
CHURCHFIELD WAY WYE WPS
Due 2026-27Great Stour between Wye and A2
08SO102727 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
DAMBRIDGE WINGHAM WWTW
Due 2026-27Wingham and Little Stour
08SO102448 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Dambridge WTW
Due 2026-27Wingham and Little Stour
08SO102612 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Foads Lane Ramsgate WPS
Due 2026-27Monkton and Minster Marshes
08SO102750 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
FOADS LANE RAMSGATE WPS
Due 2026-27Monkton and Minster Marshes
08SO102571 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
LENHAM WTW
Due 2026-27Upper Great Stour
08SO102793 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
LENHAM WWTW
Due 2026-27Upper Great Stour
08SO102534 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
May Street Herne Bay WTW
Due 2026-27Hogwell Sewer and Chislet North Stream
08SO102809 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
MAY STREET HERNE BAY WWTW
Due 2026-27Hogwell Sewer and Chislet North Stream
08SO102458 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Minster WTW
Due 2026-27Monkton and Minster Marshes
08SO104763 · aU_MON4Monitoring
U_MON4e: MCERTS certified Flow passed forward flow monitor including civils
Old Watling Street Canterbury WPS
Due 2026-27Great Stour between A2 and West Stourmouth
08SO104762 · aU_MON3Monitoring
U_MON3b: MCERTS certified overflow operation monitor
Old Watling Street Canterbury WPS
Due 2026-27Great Stour between A2 and West Stourmouth
08SO102582 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
SELLINDGE WTW
Due 2026-27East Stour
08SO102870 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
SELLINDGE WWTW
Due 2026-27East Stour
08SO102894 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
STONEBRIDGE ROAD BROOK K WPS
Due 2026-27Great Stour between Ashford and Wye
08SO102551 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Weatherlees Hill B WTW
Due 2026-27Monkton and Minster Marshes
08SO102591 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
WESTBERE WTW
Due 2026-27Great Stour between A2 and West Stourmouth
08SO102923 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
WESTBERE WWTW
Due 2026-27Great Stour between A2 and West Stourmouth
08SO101076 · aWFD_NDLS_Chem2No deterioration
Prevent any deterioration
Ashford WTW
Due 2026-27Great Stour between Ashford and Wye
08SO101077 · aWFD_NDLS_Chem2No deterioration
Prevent any deterioration
Ashford WTW
Due 2026-27Great Stour between Ashford and Wye
08SO101078 · aWFD_NDLS_Chem2No deterioration
Prevent any deterioration
Ashford WTW
Due 2026-27Great Stour between Ashford and Wye
08SO104999 · bWFD_NDLS_Chem1No deterioration
Prevent any deterioration
Dambridge Wingham WTW
Due 2026-27Wingham and Little Stour
08SO104950 · qlEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
CHARING SSO
Due 2027-28Upper Great Stour
08SO104950 · rfEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
MAY STREET HERNE BAY SSO
Due 2027-28Hogwell Sewer and Chislet North Stream
08SO103813 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
NATS LANE BROOK K WTW
Due 2027-28Great Stour between Ashford and Wye
08SO103825 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
WYE WTW
Due 2027-28Great Stour between Ashford and Wye
08SO102663 · aHD_IMPImprovement
P and N reduction
Ashford WwTW
Due 2029-30Great Stour between Ashford and Wye
08SO102664 · aHD_IMPImprovement
P and N reduction
Canterbury WwTW
Due 2029-30Great Stour between A2 and West Stourmouth
08SO102667 · aHD_IMPImprovement
P and N reduction
Charing WwTW
Due 2029-30Upper Great Stour
08SO102665 · aHD_IMPImprovement
P and N reduction
Chartham WwTW
Due 2029-30Great Stour between Wye and A2
08SO102668 · aHD_IMPImprovement
P and N reduction
Chilham WwTW
Due 2029-30Great Stour between Wye and A2
08SO101098 · aWFD_ND_CHEM3No deterioration
Prevent any deterioration
Dambridge Wingham WTW
Due 2029-30Wingham and Little Stour
08SO102669 · aHD_IMPImprovement
P and N reduction
LENHAM
Due 2029-30Upper Great Stour
08SO104004 · bHD_IMP_NNImprovement
N reduction
MAY STREET HERNE BAY
Due 2029-30Hogwell Sewer and Chislet North Stream
08SO103839 · aWFD_NDNo deterioration
Improvements to tighten BOD
MAY STREET HERNE BAY
Due 2029-30Hogwell Sewer and Chislet North Stream
08SO104004 · aHD_IMP_NNImprovement
P reduction
MAY STREET HERNE BAY
Due 2029-30Hogwell Sewer and Chislet North Stream
08SO103240 · aEnvAct_IMP2Improvement
Preferred option is SuDS and storage, but the costs are based on storage only
MAY STREET HERNE BAY SSO
Due 2029-30Hogwell Sewer and Chislet North Stream
08SO104124 · aWFD_IMPgImprovement
Amend BOD permit
NEWNHAM VALLEY PRESTON
Due 2029-30Wingham and Little Stour
08SO102670 · aHD_IMPImprovement
P and N reduction
Sellindge WwTW
Due 2029-30East Stour
08SO102671 · aHD_IMPImprovement
P and N reduction
Westbere WwTW
Due 2029-30Great Stour between A2 and West Stourmouth
08SO102672 · bU_IMP1Improvement
Replace descriptive with numerical BOD and SS permits
Westwell WTW
Due 2029-30Upper Great Stour
08SO102672 · aHD_IMPImprovement
P and N reduction
Westwell WwTW
Due 2029-30Upper Great Stour
08SO102666 · aHD_IMPImprovement
P and N reduction
Wye WwTW
Due 2029-30Great Stour between Ashford and Wye
08SO103941 · aEnvAct_IMP2Improvement
Wetland + Lining
CHARING SSO
Due 2034-35Upper Great Stour

51 of 51 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.