Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

16
Above the 2050 cap
of 21 tracked
6
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
5
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Menheniot STWSSO
SBB00761
205093
131
318 events
+41%13.1×Rising
Minions STWSO
SBB00791
2050163 ·24
105
155 events
-36%10.5×Falling — behind
Pelynt STWSSO
SBB00918
2050123
84
213 events
-32%8.4×Falling — behind
Lodgehill STW, LiskeardSSO
SBB00693
205080
73
165 events
-9%7.3×Falling — behind
St Cleer STW, LiskeardSSO
SBB01124
2050105
67
57 events
-36%6.7×Falling — behind
Bone Mill pumping station, LooePS-CSO/EO
SBB00554
2050125
67
92 events
-46%6.7×Falling — behind
Duloe STWSO
SBB00380
2050118 ·24
41
45 events
-65%4.1×Falling — behind
Crows Nest STW, DariteSO
SBB00330
205073 ·24
40
50 events
-45%4×Falling — behind
Widegates STW, LooeSO
SBB01360
205039
39
27 events
0%3.9×Falling — behind
Trewidland STWSO
SBB01285
205018 ·24
32
27 events
+78%3.2×Rising
Sungirt Lane, LiskeardCSO
SBB01193
205015
29
82 events
+93%2.9×Rising
Dobwalls pumping stationPS-CSO/EO
SBB00368
205021 ·24
27
101 events
+29%2.7×Rising
Tredinnick STWSO
SBB01274
205036 ·24
23
19 events
-36%2.3×Falling — behind
Menheniot pumping stationPS-CSO/EO
SBB00436
20506
12
11 events
+100%1.2×Rising
Church Square, MenheniotCSO
SBB00265
20507
12
9 events
+71%1.2×Rising
Buller Quay, LooeCSO
SBB00702
2050115
12
13 events
-90%1.2×Nearly there
Scawns Hill, MenheniotCSO
SBB01057
205010 ·25
10
40 events
0%1×—Within the cap
West Looe QuayCSO
SBB01346
2050154
4
3 events
-97%0.4×Within the cap
New Road, LiskeardCSO
SBB00832
205011
3
3 events
-73%0.3×Within the cap
St Keyne Main pumping stationPS-CSO/EO
SBB01142
20500 ·25
0
0 events
—0×—Within the cap
Lake Lane pumping station, LiskeardPS-CSO/EO
SBB00657
20501
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →