Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

16
Above the 2050 cap
of 21 tracked
1
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
5
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Cromhall Jubilee Lane
WXW00584
2050127 ·24
75
15 events
-41%7.5×Falling — behind
Avonmouth Kingsweston Lane Storm Tank
WXW00096
2050141 ·24
67
160 events
-52%6.7×Falling — behind
Wotton-under-edge Hack Mill
WXW00491
205082 ·24
57
79 events
-30%5.7×Falling — behind
Tockington Moor Lane Storm Tank
WXW01142
2050105 ·24
56
12 events
-47%5.6×Falling — behind
Alveston Lower Hazel Storm Tank
WXW00080
2050105 ·24
40
100 events
-62%4×Falling — behind
Almondsbury Storm Tank
WXW00078
205086 ·24
40
42 events
-53%4×Falling — behind
Wotton-under-edge Old Coach Yard
WXW00822
205010 ·24
37
9 events
+270%3.7×Rising
Thornbury Storm Tank
WXW01136
205070 ·24
35
20 events
-50%3.5×Falling — behind
Wickwar Storm Tank
WXW01256
205055 ·24
29
51 events
-47%2.9×Falling — behind
Tockington Lower Tockington Road Adj to Ivywell
WXW00657
205055 ·24
25
23 events
-55%2.5×Falling — behind
Wotton-under-edge Water Lane
WXW01195
205043 ·24
23
17 events
-47%2.3×Falling — behind
Redwick Storm Tank
WXW00927
205040 ·24
20
15 events
-50%2×Falling — behind
Alveston Lower Hazel Inlet
WXW00079
205038 ·24
17
18 events
-55%1.7×Falling — behind
Olveston the Common
WXW00827
205057 ·24
17
11 events
-70%1.7×Falling — behind
North Nibley Storm Tank
WXW00804
205031 ·24
16
27 events
-48%1.6×Falling — behind
Tockington Mill Lodge
WXW00738
205035 ·24
14
8 events
-60%1.4×Nearly there
Charfield Storm Tank
WXW00250
205024 ·24
7
5 events
-71%0.7×Within the cap
Bristol Queen Street / Meadow Street
WXW00904
205012 ·24
6
8 events
-50%0.6×Within the cap
Bristol Third Way
WXW01134
205020 ·24
2
3 events
-90%0.2×Within the cap
Olveston Green Farm Opp Lower Leaze
WXW00482
20504 ·24
1
2 events
-75%0.1×Within the cap
Berkeley Park View Road
WXW00842
20501 ·24
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →