EA sampling point

Malcom Sargent Road upstream of East Stour

Sampled by the Environment Agency on 3 visits in 2026. Phosphate averages moderate, below the good standard. Ammonia is high. Averages are over 2023–2025.

Phosphate

2026: avg 0.170 · max 0.230 mg/l

Band, 2023–2025 average: 0.110 · Moderate

00.10.20.32026-01-09: 0.23 mg/l2026-02-12: 0.13 mg/l2026-03-04: 0.15 mg/l
High ≤ 0.036Good ≤ 0.069Moderate ≤ 0.173Poor ≤ 1.003Bad > 1.003

Ammonia

2026: avg 0.053 · max 0.061 mg/l

Band, 2023–2025 average: 0.111 · High

00.20.40.62026-02-12: 0.046 mg/l2026-03-04: 0.061 mg/l
High ≤ 0.2Good ≤ 0.3Moderate ≤ 0.75Poor ≤ 1.1Bad > 1.1

Water temperature

3.9–9.8 °C

Warm water holds less oxygen. There is no river standard for temperature here.

051015202026-01-09: 3.9 °C2026-02-12: 9.5 °C2026-03-04: 9.8 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative: the Environment Agency’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Aluminium, Dissolved (MICROGRAM PER LITRE)

EA sampling point SO-E0007332 · East Stour · 684 readings of 35 tests since 2023.

DateResultUnitSample
2026-03-04 11:03< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2026-02-12 12:24180MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2026-01-09 09:0396MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-12-01 10:57< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-11-07 13:23< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-10-01 09:5274MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-09-11 10:12< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-08-11 13:55< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-07-16 10:36< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-06-13 08:46< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-05-19 15:46< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-04-28 10:08< 20MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-03-11 09:5624MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-02-06 07:1662MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2024-01-02 08:0876MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-12-05 08:5655MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-11-06 08:5334MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-10-03 14:42< 10MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-09-11 11:27< 10MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · COMPLIANCE AUDIT (PERMIT)
2023-07-27 12:0514MICROGRAM PER LITRERIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)

Source: Environment Agency Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the River Medway.