← Portishead High Street Nr Builders Yard
Spill evidence · River Hub
Portishead High Street Nr Builders Yard
Combined sewer overflow · WXW00773 · feeds PORTSIHEAD / PILL STW
Wet weather
The discharge
- Spill day
- Sunday, 24 November 2024
- Started
- 24 Nov 2024, 08:40
- Ended
- 24 Nov 2024, 09:02
- Duration
- 22 minutes
- Receiving water
- Portbury Ditch - source to conf R Severn Estuary
- Parish
- Portishead
Rainfall evidence
Daily rainfall at the matched gauge (Clevedon) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 24/11/2024 (spill day) | 17 mm | rain |
| 23/11/2024 | 18.2 mm | rain |
| 22/11/2024 | 2.2 mm | rain |
| 21/11/2024 | 0 mm | dry |
| 20/11/2024 | 0 mm | dry |
River flow that day: 97.768 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.1 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
- EA annual return (2024)
- 27 counted spills · 40 h total
- Monitor uptime (2024)
- 100% operational
⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00773). Rainfall: EA Hydrology gauge 9122f734-9a1c-460b-acc9-b871908a9a9c. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by North Somerset Streams Data.