Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Menagwins STW, St AustellSSO SBB01120 | 2050 | 146 | 106 69 events | -27% | 10.6× | Falling — behind | |
| Luxulyan STW, St AustellSSO SBB01119 | 2050 | 64 | 86 27 events | +34% | 8.6× | Rising | |
| RocheCSO SBB01035 | 2050 | 41 | 57 41 events | +39% | 5.7× | Rising | |
| Molinnis, BugleCSO SBB00794 | 2050 | 28 | 48 71 events | +71% | 4.8× | Rising | |
| Daniels Ln, St AustellCSO SBB00346 | 2050 | 21 | 24 45 events | +14% | 2.4× | Rising | |
| Lower Sticker pumping station, St AustellPS-CSO/EO SBB00717 | 2050 | 4 | 13 15 events | +225% | 1.3× | Rising | |
| Rescorla, LuxulyanCSO SBB01022 | 2050 | 4 ·24 | 7 3 events | +75% | 0.7× | Within the cap | |
| Par No2 pumping station, St AustellPS-CSO/EO SBB00901 | 2050 | 12 | 7 6 events | -42% | 0.7× | Within the cap | |
| Tredenham Close, ParCSO SBB01273 | 2050 | 8 | 7 12 events | -13% | 0.7× | Within the cap | |
| London Apprentice pumping station, St AustelPS-CSO/EO SBB01118 | 2050 | 7 ·24 | 3 3 events | -57% | 0.3× | Within the cap | |
| Nansladron pumping station, St AustellPS-CSO/EO SBB00828 | 2050 | 4 | 2 2 events | -50% | 0.2× | Within the cap | |
| Polgooth, St AustellCSO SBB00951 | 2050 | 8 | 2 2 events | -75% | 0.2× | Within the cap | |
| Pentewan pumping station, St AustellPS-CSO/EO SBB00928 | 2050 | 1 | 2 1 events | +100% | 0.2× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →