Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Honiton STWSO SBB00591 | 2050 | 16 | 148 288 events | +825% | 14.8× | Rising | |
| Payhembury STWSSO SBB01396 | 2050 | 97 | 119 200 events | +23% | 11.9× | Rising | |
| East Budleigh pumping stationPS-CSO SBB00390 | 2050 | 99 ·24 | 80 113 events | -19% | 8× | Falling — behind | |
| Honiton STWSSO SBB00592 | 2050 | 137 | 75 79 events | -45% | 7.5× | Falling — behind | |
| Fluxton STW, Ottery St MarySO SBB00460 | 2050 | 57 | 72 110 events | +26% | 7.2× | Rising | |
| Gittisham pumping stationPS-CSO/EO SBB00490 | 2050 | 56 | 67 116 events | +20% | 6.7× | Rising | |
| Broadhembury pumping stationPS-CSO/EO SBB00164 | 2050 | 41 | 47 14 events | +15% | 4.7× | Rising | |
| Exeter Road, HonitonCSO SBB01301 | 2050 | 27 ·24 | 44 76 events | +63% | 4.4× | Rising | |
| Tipton St John pumping station, SidmouthPS-CSO/EO SBB01246 | 2050 | 4 | 36 115 events | +800% | 3.6× | Rising | |
| Fluxton STW, Ottery St MarySSO SBB00461 | 2050 | 20 | 35 25 events | +75% | 3.5× | Rising | |
| Glebe Farm pumping station, BuckerellPS-CSO/EO SBB00492 | 2050 | 49 | 34 87 events | -31% | 3.4× | Falling — behind | |
| Feniton STWSSO SBB00444 | 2050 | 57 | 33 25 events | -42% | 3.3× | Falling — behind | |
| Awliscombe pumping stationPS-CSO/EO SBB00058 | 2050 | 14 | 32 64 events | +129% | 3.2× | Rising | |
| Ottery St Mary Atten TankSO SBB00890 | 2050 | 11 | 30 41 events | +173% | 3× | Rising | |
| Talaton STWSO SBB01203 | 2050 | 101 | 29 14 events | -71% | 2.9× | Falling — behind | |
| The Ham pumping station, Sidmouth 2PS-CSO/EO SBB01226 | 2050 | 25 | 28 39 events | +12% | 2.8× | Rising | |
| Chapel Lane, Ottery St MaryCSO SBB00231 | 2050 | 9 | 28 11 events | +211% | 2.8× | Rising | |
| High Street, HonitonCSO SBB00013 | 2050 | 31 ·24 | 26 18 events | -16% | 2.6× | Falling — behind | |
| Fortescue, SidmouthCSO SBB00474 | 2050 | 18 | 26 25 events | +44% | 2.6× | Rising | |
| Manstone Ln, SidmouthCSO SBB00743 | 2050 | 18 | 19 11 events | +6% | 1.9× | Rising | |
| Butts Hill pumping station, Ottery St MaryPS-CSO/EO SBB00195 | 2050 | 16 | 17 16 events | +6% | 1.7× | Rising | |
| Millmoor Ln, Newton PopplefordCSO SBB00787 | 2050 | 90 | 15 15 events | -83% | 1.5× | Nearly there | |
| The Green, OttertonCSO SBB01224 | 2050 | 10 | 15 11 events | +50% | 1.5× | Rising | |
| Batts Lane, Ottery St. MaryCSO SBB00081 | 2050 | 14 | 13 7 events | -7% | 1.3× | Nearly there | |
| Weston pumping station, HonitonPS-CSO/EO SBB01353 | 2050 | 20 | 12 16 events | -40% | 1.2× | Nearly there | |
| 27 Oaklea, HonitonCSO SBB00021 | 2050 | 7 | 12 7 events | +71% | 1.2× | Rising | |
| West Bank pumping station, Ottery St MaryPS-CSO/EO SBB01334 | 2050 | 3 | 7 16 events | +133% | 0.7× | Within the cap | |
| Churchinford STWSSO SBB00268 | 2050 | 28 ·24 | 6 7 events | -79% | 0.6× | Within the cap | |
| Rec Ground, Newton PopplefordCSO SBB01020 | 2050 | 12 | 5 2 events | -58% | 0.5× | Within the cap | |
| Mill St, OtteryCSO SBB00788 | 2050 | 10 | 4 4 events | -60% | 0.4× | Within the cap | |
| Temple St, SidmouthCSO SBB01217 | 2050 | 2 | 4 0 events | +100% | 0.4× | Within the cap | |
| Vicarage Rd, SidmouthCSO SBB01304 | 2050 | 3 | 3 0 events | 0% | 0.3× | Within the cap | |
| Byes Ln, SidfordCSO SBB00196 | 2050 | 1 | 0 0 events | -100% | 0× | Within the cap | |
| Feniton STWSO SBB00443 | 2050 | 1 | 0 0 events | -100% | 0× | — | Within the cap |
| Castle Copse pumping station, Ottery St MaryPS-CSO/EO SBB00212 | 2050 | 6 | 0 0 events | -100% | 0× | Within the cap | |
| Buckerell Manhole pumping stationPS-CSO/EO SBB00177 | 2050 | 7 | 0 0 events | -100% | 0× | Within the cap | |
| Willowdale Close pumping station, HonitonPS-CSO/EO SBB01364 | 2050 | 1 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →