← Chapel Ln, Horrabridge

Spill evidence · River Hub

Chapel Ln, Horrabridge

Combined sewer overflow · SBB00232 · feeds HORRABRIDGE STW
Wet weather

The discharge

Spill day
Friday, 12 December 2025
Started
12 Dec 2025, 01:45
Ended
12 Dec 2025, 02:20
Duration
34 minutes 30 seconds
Receiving water
Walkham
Parish
Horrabridge

Rainfall evidence

Daily rainfall at the matched gauge (Dousland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
12/12/2025 (spill day)0.2 mmdry
11/12/202512.8 mmrain
10/12/20250.2 mmdry
09/12/20258.4 mmrain
08/12/202563.2 mmrain

River flow that day: 18.948 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
41 counted spills · 300 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00232). Rainfall: EA Hydrology gauge eb09e0d5-288f-438c-b817-d88461441f06. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Tavy Data.
Spill evidence — Chapel Ln, Horrabridge — River Tavy Data