A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

22
Measures in this catchment
WINEP, current record
22
Still active
not yet past their date
0
Assumed complete
completion date has passed
6
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SW104928 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BUCKLAND MONACHORUM
Due 2026-27lower river tavy
08SW104927 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
BUCKLAND MONACHORUM
Due 2026-27lower river tavy
08SW104780 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
HORRABRIDGE STW
Due 2026-27Walkham
08SW104779 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
HORRABRIDGE STW
Due 2026-27Walkham
08SW104764 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Lamerton STW
Due 2026-27Lumburn
08SW104765 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Lamerton STW
Due 2026-27Lumburn
08SW104730 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
MARY TAVY STW
Due 2026-27Upper River Tavy
08SW104731 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MARY TAVY STW
Due 2026-27Upper River Tavy
08SW104579 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
TAVISTOCK STW
Due 2026-27Lumburn
08SW104580 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
TAVISTOCK STW
Due 2026-27Lumburn
08SW102972 · aHD_INVInvestigation
Investigation and options appraisal to restore EFI, and investigation into habitat and/or flow improvements associated with Dartmoor SAC and Plymouth Sounds SAC.
Tavy at Lopwell Dam and Abbey Weir - Lower Tavy
Due 2026-27Lower River Tavy
08SW102973 · aHD_INVInvestigation
Investigate and confirm within waterbody impact caused by HEP abstraction. (Barrier to fish passage?)
Tavy Cleave and Hill bridge - Upper River Tavy
Due 2026-27Upper River Tavy
08SW104554 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WALKHAMPTON STW
Due 2026-27Walkham
08SW104553 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
WALKHAMPTON STW
Due 2026-27Walkham
08SW104999 · aaEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
BUCKLAND MONACHORUM STW_SSO_BUCKLAND MON
Due 2027-28BUCKLAND MONACHORUM STW_SSO_BUCKLAND MON
08SW104999 · geEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
MARY TAVY STW_SSO_MARY TAVY
Due 2027-28MARY TAVY STW_SSO_MARY TAVY
08SW104294 · aU_IMP4Improvement
To comply with UWWTR
PLAYING FIELD_CSO_TAVISTOCK
Due 2027-28PLAYING FIELD_CSO_TAVISTOCK
08SW104295 · aU_IMP4Improvement
To comply with UWWTR
WESTBRIDGE COTTS_CSO_TAVISTOCK
Due 2027-28WESTBRIDGE COTTS_CSO_TAVISTOCK
08SW102962 · aEE_IMPImprovement
(Abstraction) Combined INV/IMP required. SWW ownership to be confirmed. Site being looked at as part of the PR24 INTAKE project. Investigation and implementation.
Eel Abstraction - R Tavy at Abbey Weir
Due 2029-30Lower River Tavy
08SW102948 · aEE_IMPImprovement
(Abstraction) Combined INV/IMP required. Site being looked at as part of the PR24 INTAKE project.
Eel Abstraction - R Tavy at Hill Bridge
Due 2029-30Upper River Tavy
08SW102967 · dEE_IMPImprovement
Deliver a physical improvement
Eel Obstruction - R Tavy at Abbey Weir
Due 2029-30Lower River Tavy
08SW102967 · eEE_IMPImprovement
Deliver a physical improvement
Eel Obstruction - R Tavy at Hill Bridge
Due 2029-30Lower River Tavy

22 of 22 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.