Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Mary Tavy STWSSO SBB00753 | 2050 | 192 | 126 45 events | -34% | 12.6× | Falling — behind | |
| Bedford Bridge, HorrabridgeCSO SBB00093 | 2050 | 138 | 111 82 events | -20% | 11.1× | Falling — behind | |
| Lamerton STWSO SBB00658 | 2050 | 139 ·24 | 109 42 events | -22% | 10.9× | Falling — behind | |
| Walkhampton STWSSO SBB01313 | 2050 | 77 ·24 | 104 27 events | +35% | 10.4× | Rising | |
| Harrowbeer, YelvertonCSO SBB00541 | 2050 | 89 ·24 | 83 173 events | -7% | 8.3× | Falling — behind | |
| Playing Field, TavistockCSO SBB01210 | 2050 | 86 | 80 114 events | -7% | 8× | Falling — behind | |
| Clinic, TavistockCSO SBB01335 | 2050 | 75 | 79 145 events | +5% | 7.9× | Rising | |
| Crowndale, TavistockCSO SBB00326 | 2050 | 76 | 72 74 events | -5% | 7.2× | Falling — behind | |
| Pixon Ln, TavistockCSO SBB00940 | 2050 | 162 | 67 63 events | -59% | 6.7× | Falling — behind | |
| Westbridge Cotts, TavistockCSO SBB01091 | 2050 | 66 | 64 90 events | -3% | 6.4× | Falling — behind | |
| Horrabridge STWSSO SBB00598 | 2050 | 152 | 53 53 events | -65% | 5.3× | Falling — behind | |
| Buckland Monachorum STWSSO SBB00181 | 2050 | 134 | 52 22 events | -61% | 5.2× | Falling — behind | |
| Chapel Ln, HorrabridgeCSO SBB00232 | 2050 | 46 ·24 | 41 41 events | -11% | 4.1× | Falling — behind | |
| Bishops Mead, TavistockCSO SBB00108 | 2050 | 23 | 29 29 events | +26% | 2.9× | Rising | |
| Crowndale STW, TavistockSSO SBB00327 | 2050 | 105 | 9 8 events | -91% | 0.9× | Within the cap | |
| Plymouth Rd, TavistockCSO SBB00947 | 2050 | 4 | 5 3 events | +25% | 0.5× | Within the cap | |
| Church Lane, TavistockCSO SBB00260 | 2050 | 0 ·25 | 0 0 events | — | 0× | — | Within the cap |
| Mount House pumping station, TavistockPS-CSO/EO SBB00811 | 2050 | 10 | 0 0 events | -100% | 0× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →