← Horns Cross STW

Spill evidence · River Hub

Horns Cross STW

Storm overflow at the works · SBB00597 · feeds HORNS CROSS_STW_HORNS CROSS
Wet weather

The discharge

Spill day
Thursday, 27 November 2025
Started
27 Nov 2025, 09:00
Ended
27 Nov 2025, 09:17
Duration
16 minutes 20 seconds
Receiving water
Upper River Yeo (Bideford)
Parish
Alwington

Rainfall evidence

Daily rainfall at the matched gauge (Parkham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
27/11/2025 (spill day)3.4 mmrain
26/11/20255.5 mmrain
25/11/20250.1 mmdry
24/11/20250 mmdry
23/11/202512.5 mmrain

River flow that day: 5.957 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2025)
230 counted spills · 2035 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00597). Rainfall: EA Hydrology gauge 93a22248-0c5a-4204-a655-f12b202b4570. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Torridge Data.