← 11 High Street, Hatherleigh

Spill evidence · River Hub

11 High Street, Hatherleigh

Combined sewer overflow · SBB00005 · feeds HATHERLEIGH_STW_HATHERLEIGH
Wet weather

The discharge

Spill day
Thursday, 29 February 2024
Started
29 Feb 2024, 07:02
Ended
29 Feb 2024, 07:37
Duration
34 minutes 54 seconds
Receiving water
Lower River Lew (Torridge)
Parish
Hatherleigh

Rainfall evidence

Daily rainfall at the matched gauge (Allisland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
29/02/2024 (spill day)10.7 mmrain
28/02/202411.4 mmrain
27/02/20241.3 mmrain
26/02/20240 mmdry
25/02/20248.5 mmrain

River flow that day: 15.431 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
48 counted spills · 109 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00005). Rainfall: EA Hydrology gauge 74b6bed8-b1d4-4e50-95da-206beee58f90. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Torridge Data.