← Hatherleigh Bridge

Spill evidence · River Hub

Hatherleigh Bridge

Combined sewer overflow · SBB00545 · feeds HATHERLEIGH_STW_HATHERLEIGH
Dry spill

Evidence strength

High confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Thursday, 11 January 2024
Started
11 Jan 2024, 19:55
Ended
12 Jan 2024, 01:42
Duration
5 hours 47 minutes
Receiving water
Lower River Lew (Torridge)
Parish
Hatherleigh

Rainfall evidence

Daily rainfall at the matched gauge (Allisland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
11/01/2024 (spill day)0 mmdry
10/01/20240 mmdry
09/01/20240 mmdry
08/01/20240 mmdry
07/01/20240.2 mmdry

River flow that day: 8.661 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
84 counted spills · 435 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00545). Rainfall: EA Hydrology gauge 74b6bed8-b1d4-4e50-95da-206beee58f90. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Torridge Data.