← Hatherleigh Bridge

Spill evidence · River Hub

Hatherleigh Bridge

Combined sewer overflow · SBB00545 · feeds HATHERLEIGH_STW_HATHERLEIGH
No rain data

The discharge

Spill day
Wednesday, 10 June 2020
Started
10 Jun 2020, 23:47
Ended
11 Jun 2020, 04:36
Duration
4 hours 48 minutes
Receiving water
Lower River Lew (Torridge)
Parish
Hatherleigh

Rainfall evidence

Daily rainfall at the matched gauge (Allisland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
10/06/2020 (spill day)no data
09/06/2020no data
08/06/2020no data
07/06/2020no data
06/06/2020no data

River flow that day: 1.652 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00545). Rainfall: EA Hydrology gauge 74b6bed8-b1d4-4e50-95da-206beee58f90. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Torridge Data.