← Manor Hall, Hatherleigh

Spill evidence · River Hub

Manor Hall, Hatherleigh

Combined sewer overflow · SBB00742 · feeds HATHERLEIGH_STW_HATHERLEIGH
Dry spill

Evidence strength

Low confidence
  • ✓ Dry on the EA 1-day window
  • ⚠ Short discharge (<1 h) — weaker signal
  • ⚠ Monitor only 80% operational that year — data may be incomplete

The discharge

Spill day
Thursday, 7 March 2024
Started
7 Mar 2024, 12:02
Ended
7 Mar 2024, 12:32
Duration
30 minutes
Receiving water
Lower River Lew (Torridge)
Parish
Hatherleigh

Rainfall evidence

Daily rainfall at the matched gauge (Allisland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
07/03/2024 (spill day)0 mmdry
06/03/20240.1 mmdry
05/03/20240.5 mmrain
04/03/20246.4 mmrain
03/03/20240.1 mmdry

River flow that day: 10.189 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
81 counted spills · 211 h total
Monitor uptime (2024)
80% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00742). Rainfall: EA Hydrology gauge 74b6bed8-b1d4-4e50-95da-206beee58f90. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Torridge Data.