Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

11
Above the 2050 cap
of 18 tracked
5
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
7
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Lutton STWSSO
SBB00724
2050118 ·24
118
74 events
0%11.8×Falling — behind
Lee Mill STW, PlymouthSO
SBB00678
205096
116
187 events
+21%11.6×Rising
Lutton STWSO
SBB00723
2050110 ·24
106
263 events
-4%10.6×Falling — behind
Sparkwell STWSSO
SBB01111
205022
79
31 events
+259%7.9×Rising
Bridgend pumping station, Newton FerrersPS-CSO/EO
SBB00157
205022
53
77 events
+141%5.3×Rising
Lee Mill pumping station, PlymouthPS-CSO/EO
SBB00677
205048
36
38 events
-25%3.6×Falling — behind
Cornwood pumping station, LuttonPS-CSO/EO
SBB00308
205039 ·24
34
32 events
-13%3.4×Falling — behind
Brixton STWSSO
SBB00162
205054
22
129 events
-59%2.2×Falling — behind
Torbridge South, YealmptonCSO
SBB01254
20509
16
11 events
+78%1.6×Rising
Yealmpton STWSSO
SBB01387
205015
14
11 events
-7%1.4×Nearly there
Tinwood, SparkwellCSO
SBB01245
20509
14
25 events
+56%1.4×Rising
Winston Ln, BrixtonCSO
SBB01372
205013
9
4 events
-31%0.9×Within the cap
Church Way, YealmptonCSO
SBB00267
20501
8
1 events
+700%0.8×Within the cap
Yealmpton pumping stationPS-CSO/EO
SBB01386
205026
4
3 events
-85%0.4×Within the cap
Courtwood pumping station, Newton FerrersPS-CSO/EO
SBB00314
20501
4
4 events
+300%0.4×Within the cap
Riverside No. 1, Newton FerrersCSO
SBB01029
205027
3
0 events
-89%0.3×Within the cap
Kiln Quay pumping station, Newton FerrersPS-CSO/EO
SBB00632
20502 ·25
2
1 events
0%0.2×—Within the cap
Torbridge North, YealmptonCSO
SBB01253
20501 ·24
2
1 events
+100%0.2×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →