Miscellaneous Brit Catchment
Sampled by the Environment Agency on 4 visits from 2024 to 2026. Phosphate is good or better. Averages are over 2023–2025.
Phosphate
2024–2026: avg 0.070 · max 0.150 mg/lBand, 2023–2025 average: 0.066 · Good
Ammonia
2024–2026: avg 0.433 · max 3.200 mg/lDissolved oxygen
2024–2026: avg 84 · min 58 % saturationWater temperature
11.0–12.2 °CWarm water holds less oxygen. There is no river standard for temperature here.
Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative: the Environment Agency’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.
Every reading: BOD : 5 Day ATU (MILLIGRAM PER LITRE)
EA sampling point SW-50819999 · Brit (Upper) · 102 readings of 12 tests since 2022.
| Date | Result | Unit | Sample |
|---|---|---|---|
| 2026-04-05 16:05 | < 1 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
| 2026-04-05 15:31 | 1 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
| 2026-04-05 15:22 | < 3 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
| 2025-09-10 16:37 | 4.7 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING FORMAL (POLLUTION INCIDENTS) |
| 2025-09-10 16:25 | 34 | MILLIGRAM PER LITRE | ANY SEWAGE · UNPLANNED REACTIVE MONITORING FORMAL (POLLUTION INCIDENTS) |
| 2025-09-10 16:18 | < 3 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING FORMAL (POLLUTION INCIDENTS) |
| 2024-09-15 13:16 | 1.4 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
| 2024-09-15 13:15 | < 1 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
| 2024-09-15 13:00 | < 60 | MILLIGRAM PER LITRE | CRUDE SEWAGE · UNPLANNED REACTIVE MONITORING FORMAL (POLLUTION INCIDENTS) |
| 2024-03-19 16:31 | < 1 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
| 2024-03-19 16:30 | 1.1 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
| 2022-08-19 12:15 | 15 | MILLIGRAM PER LITRE | RIVER / RUNNING SURFACE WATER · UNPLANNED REACTIVE MONITORING (POLLUTION INCIDENTS) |
Source: Environment Agency Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Axe & Lim.