Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Bone Mill pumping station, LooePS-CSO/EO480Looe STWMeasure linked
West Looe QuayCSO304Looe STWMeasure linked
Buller Quay, LooeCSO254Looe STWMeasure linked
Sungirt Lane, LiskeardCSO151Liskeard STWNo measure
Dobwalls pumping stationPS-CSO/EO68Liskeard STWNo measure
Scawns Hill, MenheniotCSO40Menheniot STWNo measure
Menheniot pumping stationPS-CSO/EO5Menheniot STWNo measure
New Road, LiskeardCSO4Liskeard STWNo measure
Church Square, MenheniotCSO2Menheniot STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.