Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

9
Above the 2050 cap
of 24 tracked
1
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
15
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Lyndhurst, - 115810SSO
SWS00534
2050100 ·24
60
52 events
-40%6×Falling — behind
Brockenhurst, - 115374SSO
SWS00109
2050119 ·24
52
161 events
-56%5.2×Falling — behind
Ashdene Road Ashurst, - 108392CSO
SWS00024
205027 ·24
48
48 events
+78%4.8×Rising
Flexford Lane Sway, - 115913SSO
SWS00318
2050132 ·24
43
30 events
-67%4.3×Falling — behind
Boldre, - 115772SSO
SWS00078
205074 ·24
38
26 events
-49%3.8×Falling — behind
Beaulieu Village, - 115397SSO
SWS00051
205043 ·24
27
19 events
-37%2.7×Falling — behind
Lymore, - 108463CSO
SWS00532
205084 ·24
26
52 events
-69%2.6×Falling — behind
High Street Lymington, - 101701CSO
SWS00426
205036 ·24
21
15 events
-42%2.1×Falling — behind
Downes Park Totton Ceo - 108423
SWS00263
205028 ·24
12
44 events
-57%1.2×Nearly there
Brockenhurst, - 115399CSO
SWS00108
205019 ·24
10
11 events
-47%1×Within the cap
Green Lane Lyndhurst Ceo - 108892
SWS00369
205012 ·24
7
8 events
-42%0.7×Within the cap
Fire Station Lane Beaulieu Ceo - 108394
SWS00050
20505 ·24
6
4 events
+20%0.6×Within the cap
Ashurst Bridge Ceo - 108393
SWS00030
205025 ·24
6
5 events
-76%0.6×Within the cap
East Boldre, - 115911SSO
SWS00267
205021 ·24
6
5 events
-71%0.6×Within the cap
Becton Lane Barton on Sea Ceo - 108766
SWS00053
20505 ·24
4
4 events
-20%0.4×Within the cap
Lyndhurst Golf Club Ceo - 108893
SWS00533
20505 ·24
3
3 events
-40%0.3×Within the cap
Station Street Lymington No 1, - 102640CSO
SWS00829
20503 ·25
3
3 events
0%0.3×—Within the cap
Friars Walk Barton on Sea, - 108432CSO
SWS00335
20502 ·25
2
1 events
0%0.2×—Within the cap
Sky End Lane Hordle, - 110232CSO
SWS00780
20502 ·25
2
3 events
0%0.2×—Within the cap
Southern Road Pennington, - 108483CSO
SWS00799
20505 ·24
2
0 events
-60%0.2×Within the cap
Lymington Slipway Pennington, - 108453CSO
SWS00531
20503 ·24
2
1 events
-33%0.2×Within the cap
Sunnyfield Road Barton on Sea, - 108490CSO
SWS00840
20501 ·25
1
0 events
0%0.1×—Within the cap
Bridge Road Screen Lymington, - 101813CSO
SWS00094
20501 ·25
1
1 events
0%0.1×—Within the cap
West Common Fawley Ceo - 108890
SWS00921
20501 ·24
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →