Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Portishead Portbury Ditch Off Harbour Rd123Portsihead / Pill STWNo measure
Portishead Town Harbour Road79Portsihead / Pill STWNo measure
Portishead Coombe/slade Road Junction67Portsihead / Pill STWNo measure
Portishead High Street Nr Builders Yard58Portsihead / Pill STWNo measure
Sandford Sandmead Lane46Weston Super Mare STWNo measure
Clevedon Main45Clevedon / Nailsea / Yatton STWNo measure
Langford Blackmoor Road41Weston Super Mare STWNo measure
Portishead Slade Road O/s 4725Portsihead / Pill STWNo measure
Portishead Poacher Hotel (anchor Hotel)21Portsihead / Pill STWNo measure
Sandford Batch20Winscombe STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.