DonateLog in
River Hub
Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

10
Measures in this catchment
WINEP, current record
10
Still active
not yet past their date
0
Assumed complete
completion date has passed
1
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SO104950 · odEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the Shellfish Water and ensure no more than 10 spills per annum (on average) as an agglomeration
HIGH STREET FAREHAM CSO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO104950 · dgEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the Shellfish Water and ensure no more than 10 spills per annum (on average) as an agglomeration
WALLINGTON HILL FAREHAM CSO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO104950 · dnEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the Shellfish Water and ensure no more than 10 spills per annum (on average) as an agglomeration
WICKHAM ROAD FAREHAM CSO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO100082 · aSW_NDNo deterioration
SuDS + Storage
ARUNDEL DRIVE FAREHAM CSO
Due 2027-28THE GILLIES FAREHAM CSO - 103266
08SO100087 · aSW_NDNo deterioration
Currently meets Defra spills requirements but part of the Portsmouth Harbour Shellfish agglomeration requiring 10 spills per annum across all 36 overflows discharging into the Harbour. The INV4 investigation will identify if any works are required. We will need to apply to Ofwat for costs through a uncertainty mechanism as costs are not known at this stage.
BRIDGEFOOT FAREHAM CEO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO103242 · aSW_NDNo deterioration
Preferred option is SuDS and Storage, however costs for this action are based on storage only, as options for green solutions are not known at this time.
CAMS HILL FAREHAM CSO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO103250 · aSW_NDNo deterioration
SuDS + Storage
HIGH STREET FAREHAM CSO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO100208 · aSW_NDNo deterioration
Currently meets Defra spills requirements but part of the Portsmouth Harbour Shellfish agglomeration requiring 10 spills per annum across all 36 overflows discharging into the Harbour. The INV4 investigation will identify if any works are required. We will need to apply to Ofwat for costs through a uncertainty mechanism as costs are not known at this stage.
WALLINGTON HILL FAREHAM CSO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO100213 · aSW_NDNo deterioration
Currently meets Defra spills requirements but part of the Portsmouth Harbour Shellfish agglomeration requiring 10 spills per annum across all 36 overflows discharging into the Harbour. The INV4 investigation will identify if any works are required. We will need to apply to Ofwat for costs through a uncertainty mechanism as costs are not known at this stage.
WICKHAM ROAD FAREHAM CSO
Due 2027-28QUAY STREET FAREHAM CSO - 108476
08SO100093 · aSW_IMPImprovement
Currently meets Defra spills requirements but part of the Portsmouth Harbour Shellfish agglomeration requiring 10 spills per annum across all 36 overflows discharging into the Harbour. The INV4 investigation will identify if any works are required. We will need to apply to Ofwat for costs through a uncertainty mechanism as costs are not known at this stage.
BURRFIELDS ROAD PORTSMOUTH CSO
Due 2029-30BURRFIELDS ROAD PORTSMOUTH CSO - 108405

10 of 10 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.