Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

21
Above the 2050 cap
of 24 tracked
7
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
3
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Pyworthy STWSSO
SBB00994
2050171 ·24
146
53 events
-15%14.6×Falling — behind
Newport, LauncestonCSO
SBB00834
2050110
118
183 events
+7%11.8×Rising
Egloskerry STWSO
SBB00409
2050141 ·24
116
178 events
-18%11.6×Falling — behind
Derriton STW, HolsworthySSO
SBB00583
2050168
111
154 events
-34%11.1×Falling — behind
Ashwater STWSO
SBB00055
205097 ·24
104
128 events
+7%10.4×Rising
Yeolmbridge pumping stationPS-CSO/EO
SBB01392
205097
96
14 events
-1%9.6×Falling — behind
Pyworthy pumping station, DerrilPS-CSO/EO
SBB00362
205079 ·24
89
80 events
+13%8.9×Rising
Halwill STWSO
SBB00530
2050110 ·24
85
94 events
-23%8.5×Falling — behind
Derriton STW, HolsworthySO
SBB00582
205082
77
124 events
-6%7.7×Falling — behind
North Petherwin STWSO
SBB00844
2050255
74
21 events
-71%7.4×Falling — behind
St Leonards STW, LauncestonSSO
SBB01144
205085
74
56 events
-13%7.4×Falling — behind
Westcroft, HolsworthyCSO
SBB01340
205082 ·24
72
151 events
-12%7.2×Falling — behind
Warbstow STWSO
SBB01403
205020 ·24
66
85 events
+230%6.6×Rising
YeolmbridgeCSO
SBB01391
205059 ·24
47
38 events
-20%4.7×Falling — behind
St Leonards STW, LauncestonSO
SBB01143
205053
39
48 events
-26%3.9×Falling — behind
Dobles Lane pumping station, HolsworthyPS-CSO/EO
SBB00367
205039 ·24
38
33 events
-3%3.8×Falling — behind
Bridgerule STWSO
SBB00159
205040 ·24
34
21 events
-15%3.4×Falling — behind
St Giles O T Heath pumping stationPS-CSO/EO
SBB01136
205017 ·24
22
30 events
+29%2.2×Rising
Egloskerry pumping station, LauncestonPS-CSO/EO
SBB00408
205077
22
14 events
-71%2.2×Falling — behind
Langore pumping station, LauncestonPS-CSO/EO
SBB00663
205011
21
14 events
+91%2.1×Rising
Clawton STWSO
SBB00271
205011 ·24
12
8 events
+9%1.2×Rising
St Thomas Rd, LauncestonCSO
SBB01159
20506
5
3 events
-17%0.5×Within the cap
Tregadillet pumping station, LauncestonPS-CSO/EO
SBB01277
205026
3
1 events
-88%0.3×Within the cap
The Bridge pumping station, BridgerulePS-CSO/EO
SBB00158
20501 ·23
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →