Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

37
Measures in this catchment
WINEP, current record
37
Still active
not yet past their date
0
Assumed complete
completion date has passed
11
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SO102557 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
CHILBOLTON WTW
Due 2026-27CHILBOLTON
08SO102718 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
CHILBOLTON WWTW
Due 2026-27Test - conf Dever to conf Anton
08SO102415 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
East Grimstead WTW
Due 2026-27Dun
08SO102733 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
EAST GRIMSTEAD WWTW
Due 2026-27Dun
08SO102755 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
FRITTENDEN WWTW
Due 2026-27Test - conf Dever to conf Anton
08SO102418 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Fullerton WTW
Due 2026-27Test - conf Dever to conf Anton
08SO102756 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
FULLERTON WWTW
Due 2026-27Test - conf Dever to conf Anton
08SO102492 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Kings Somborne WTW
Due 2026-27Test - conf Anton to conf Dun
08SO102789 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
KINGS SOMBORNE WWTW
Due 2026-27Test - conf Anton to conf Dun
08SO102420 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Millbrook WTW
Due 2026-27Tanner's Brook
08SO104732 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Overton WWTW
Due 2026-27Test (Upper)
08SO102833 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
OVERTON WWTW
Due 2026-27Test (Upper)
08SO102577 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
REDLYNCH WTW
Due 2026-27REDLYNCH
08SO102855 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
REDLYNCH WWTW
Due 2026-27Blackwater
08SO102422 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Romsey WTW
Due 2026-27Test - conf Dun to Tadburn Lake
08SO102860 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
ROMSEY WWTW
Due 2026-27Test - conf Dun to Tadburn Lake
08SO102503 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Stockbridge WTW
Due 2026-27STOCKBRIDGE
08SO102891 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
STOCKBRIDGE WWTW
Due 2026-27Test - conf Anton to conf Dun
08SO102504 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
West Wellow WTW
Due 2026-27Blackwater (Test and Itchen)
08SO102922 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
WEST WELLOW WWTW
Due 2026-27Blackwater (Test and Itchen)
08SO102506 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Whiteparish WTW
Due 2026-27WHITEPARISH
08SO102927 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
WHITEPARISH WWTW
Due 2026-27Whiteparish Trib
08SO104950 · nEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
KINGS SOMBORNE SSO
Due 2027-28Test - conf Anton to conf Dun
08SO104950 · jEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
REDLYNCH SSO
Due 2027-28Blackwater
08SO104950 · osEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
STOCKBRIDGE SSO
Due 2027-28Test - conf Anton to conf Dun
08SO104950 · orEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
WEST WELLOW SSO
Due 2027-28Blackwater (Test and Itchen)
08SO104002 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 13.79 mg/l
Barton Stacey WwTW
Due 2029-30Dever
08SO103973 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 37.90 mg/l
EAST GRIMSTEAD
Due 2029-30Dun
08SO104008 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 10 mg/l
Fullerton WwTW
Due 2029-30Test - conf Dever to conf Anton
08SO103979 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 10 mg/l
KINGS SOMBORNE WWTW
Due 2029-30Test - conf Anton to conf Dun
08SO100029 · aNERC_IMPImprovement
This project takes the outcomes of the strategy development (late AMP7/early AMP8) project and implements enhancement actions in collaboration with existing catchment partners. This project is looking to identify a plan for enhancements over the next 10 years to improve the River Anton, from both a quality and quantity perspective.
River Anton - Working with Catchment Partners to develop a strategy and implement restoration of the River as part of the CABA chalk stream restoration flagship programme.
Due 2029-30Anton - Upper
08SO104007 · aHD_IMP_NNImprovement
N reduction
Romsey WwTW
Due 2029-30Test - conf Dun to Tadburn Lake
08SO104009 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 19.40 mg/l
West Wellow WwTW
Due 2029-30Blackwater (Test and Itchen)
08SO103965 · aEnvAct_IMP2Improvement
Wetland + Lining
KINGS SOMBORNE SSO
Due 2034-35Test - conf Anton to conf Dun
08SO103955 · aEnvAct_IMP2Improvement
Wetland + Lining
REDLYNCH SSO
Due 2034-35Blackwater
08SO103953 · aEnvAct_IMP2Improvement
SuDS + Storage
STOCKBRIDGE SSO
Due 2034-35Test - conf Anton to conf Dun
08SO103900 · aEnvAct_IMP2Improvement
SuDS + Storage
WEST WELLOW SSO
Due 2034-35Blackwater (Test and Itchen)

37 of 37 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.