Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Kings Somborne, - 115725SSO SWS00478 | 2050 | 252 ·24 | 125 32 events | -50% | 12.5× | Falling — behind | |
| West Wellow, - 115727SSO SWS00926 | 2050 | 216 ·24 | 101 169 events | -53% | 10.1× | Falling — behind | |
| East Grimstead, - 115851SSO SWS00269 | 2050 | 156 ·24 | 64 176 events | -59% | 6.4× | Falling — behind | |
| Overton, - 115916SSO SWS00633 | 2050 | 144 ·24 | 36 58 events | -75% | 3.6× | Falling — behind | |
| Redlynch, - 115737SSO SWS00703 | 2050 | 138 ·24 | 35 14 events | -75% | 3.5× | Falling — behind | |
| Wellow Mill Blackhill Ceo - 108499 SWS00915 | 2050 | 63 ·24 | 25 24 events | -60% | 2.5× | Falling — behind | |
| Stockbridge, - 115752SSO SWS00831 | 2050 | 100 ·24 | 18 160 events | -82% | 1.8× | Falling — behind | |
| Romsey, - 115431SSO SWS00718 | 2050 | 68 ·24 | 17 16 events | -75% | 1.7× | Falling — behind | |
| Ringwood Drive North Baddesley Ceo - 109515 SWS00709 | 2050 | 24 ·24 | 9 17 events | -63% | 0.9× | Within the cap | |
| Chilbolton, - 115879SSO SWS00178 | 2050 | 17 ·24 | 2 1 events | -88% | 0.2× | Within the cap | |
| Trafalgar Way Stockbridge Ceo - 108500 SWS00884 | 2050 | 5 ·24 | 2 2 events | -60% | 0.2× | Within the cap | |
| Sws90056 SWS90056 | 2050 | 1 ·25 | 1 1 events | 0% | 0.1× | — | Within the cap |
| Memorial Park Romsey Ceo - 110235 SWS00563 | 2050 | 4 ·24 | 1 1 events | -75% | 0.1× | Within the cap | |
| Fullerton, - 115765SSO SWS00338 | 2050 | 74 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Pollards Moor Cadnam Ceo - 108473 SWS00669 | 2050 | 0 ·24 | 0 0 events | — | 0× | — | Within the cap |
| The Hundred Romsey, - 110233CSO SWS00862 | 2050 | 4 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Houghton Road Stockbridge Ceo - 108487 SWS00454 | 2050 | 5 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Botley Road North Baddesley Ceo - 108398 SWS00082 | 2050 | 2 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Eight Acres Romsey, - 110234CSO SWS00285 | 2050 | 0 ·24 | 0 0 events | — | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →