Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Lavant No.1, - 115745SSO SWS00496 | 2050 | 287 ·24 | 166 311 events | -42% | 16.6× | Falling — behind | |
| Lidsey, - 115776SSO SWS00503 | 2050 | 226 ·24 | 157 219 events | -31% | 15.7× | Falling — behind | |
| Marshall Close Barnham, - 108037CSO SWS00557 | 2050 | 124 ·24 | 71 334 events | -43% | 7.1× | Falling — behind | |
| Chichester Wtw 1, - 115402SSO SWS00172 | 2050 | 82 ·24 | 62 71 events | -24% | 6.2× | Falling — behind | |
| Sidlesham, - 115807SSO SWS00774 | 2050 | 57 ·24 | 37 43 events | -35% | 3.7× | Falling — behind | |
| Summer Lane Pagham, - 115443SSO SWS00640 | 2050 | 72 ·24 | 22 13 events | -69% | 2.2× | Falling — behind | |
| Bognor Main Ceo - 107412 SWS00597 | 2050 | 20 ·24 | 10 13 events | -50% | 1× | Within the cap | |
| Tangmere, - 115777SSO SWS00845 | 2050 | 128 ·24 | 10 6 events | -92% | 1× | Within the cap | |
| Pagham Road North Mundham Ceo - 108291 SWS00612 | 2050 | 29 ·24 | 8 0 events | -72% | 0.8× | Within the cap | |
| Main Road Hunston Ceo - 108280 SWS00540 | 2050 | 9 ·24 | 4 8 events | -56% | 0.4× | Within the cap | |
| Chichester Wtw 2, - 115401SSO SWS00173 | 2050 | 32 ·24 | 4 4 events | -88% | 0.4× | Within the cap | |
| Gloucester Road Bognor, - 103299CSO SWS00351 | 2050 | 7 ·24 | 3 4 events | -57% | 0.3× | Within the cap | |
| Chichester Road Bognor, - 103301CSO SWS00171 | 2050 | 4 ·24 | 1 2 events | -75% | 0.1× | Within the cap | |
| Singleton Relief Ceo - 108335 SWS00685 | 2050 | 146 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Church Road Selsey, - 108206CSO SWS00181 | 2050 | 1 ·21 | 0 0 events | -100% | 0× | — | Within the cap |
| Shripney Road South Bersted Ceo - 107408 SWS00773 | 2050 | 3 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →